IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
NAICS 333618 Other Engine Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0632 # 12 Y:2022 12 2022 INSTALL OCCUPANCY SENSORS $371 $1,135 Implemented
WV0632 # 11 Y:2022 11 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $456 $1,192 Implemented
WV0632 # 10 Y:2022 10 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $669 $3,115 Implemented
WV0632 # 09 Y:2022 09 2022 DEVELOP A REPAIR/REPLACE POLICY $714 $1,638 Implemented
WV0632 # 08 Y:2022 08 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $727 $92 Implemented
WV0632 # 07 Y:2022 07 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $865 $2,227 Not Implemented
WV0632 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $1,112 $1,037 Implemented
WV0632 # 05 Y:2022 05 2022 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,169 $5,688 Not Implemented
WV0632 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,805 $706 Implemented
WV0632 # 03 Y:2022 03 2022 UPGRADE CONTROLS ON COMPRESSORS $4,403 $2,234 Not Implemented
WV0632 # 02 Y:2022 02 2022 IMPROVE COMBUSTION CONTROL CAPABILITY $5,035 $3,423 Implemented
WV0632 # 01 Y:2022 01 2022 MINIMIZE WATER USAGE $12,558 $11,644 Not Implemented
LE0412 # 07 Y:2016 07 2016 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,939 $35,720 Implemented
LE0412 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,108 $4,125 Not Implemented
LE0412 # 05 Y:2016 05 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,944 $18,280 Not Implemented
LE0412 # 04 Y:2016 04 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $462 $1,382 Implemented
LE0412 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,688 $19,250 Implemented
LE0412 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,397 $8,050 Implemented
LE0412 # 01 Y:2016 01 2016 PREHEAT COMBUSTION AIR WITH WASTE HEAT $13,984 $20,000 Not Implemented
LE0190 # 01 Y:2004 01 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $65,403 $20,000 Implemented
LE0190 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,187 $33,512 Implemented
LE0190 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,074 $218 Implemented
LE0190 # 04 Y:2004 04 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,412 $750 Not Implemented
LE0190 # 03 Y:2004 03 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,450 $2,500 Not Implemented
LE0190 # 02 Y:2004 02 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $17,844 $50,000 Not Implemented