Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,644
matching recommendationsNAICS | 3339 | Other General Purpose Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0326 # 03 Y:2025 | 03 | 2025 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $2,701 | $2,400 | n/a |
TT0326 # 08 Y:2025 | 08 | 2025 | INSTALL OCCUPANCY SENSORS | $1,871 | $4,200 | n/a |
TT0326 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,814 | $870 | n/a |
TT0326 # 02 Y:2025 | 02 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $7,420 | $1,800 | n/a |
TT0326 # 07 Y:2025 | 07 | 2025 | ADOPT IN-HOUSE MATERIAL GENERATION | $50,975 | $110,000 | n/a |
TT0326 # 09 Y:2025 | 09 | 2025 | USE SOLAR HEAT FOR HEAT | $87,059 | $375,030 | n/a |
TT0326 # 10 Y:2025 | 10 | 2025 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $47,285 | $724,290 | n/a |
TT0326 # 04 Y:2025 | 04 | 2025 | INSULATE BARE EQUIPMENT | $3,234 | $3,600 | n/a |
TT0326 # 05 Y:2025 | 05 | 2025 | OPTIMIZE PLANT POWER FACTOR | $2,637 | $3,000 | n/a |
TT0326 # 06 Y:2025 | 06 | 2025 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $8,775 | $15,000 | n/a |
LE0593 # 06 Y:2025 | 06 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,077 | $35,157 | n/a |
LE0593 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,724 | $13,069 | n/a |
LE0593 # 07 Y:2025 | 07 | 2025 | INSTALL OCCUPANCY SENSORS | $133 | $479 | n/a |
LE0593 # 08 Y:2025 | 08 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $727 | $3,014 | n/a |
LE0593 # 01 Y:2025 | 01 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $19,297 | $0 | n/a |
LE0593 # 03 Y:2025 | 03 | 2025 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $15,667 | $20,000 | n/a |
LE0593 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,196 | $1,640 | n/a |
LE0593 # 04 Y:2025 | 04 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,704 | $4,000 | n/a |
WM0238 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,613 | $0 | n/a |
WM0238 # 04 Y:2025 | 04 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $624 | $0 | n/a |
WM0238 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,981 | $3,250 | n/a |
WM0238 # 03 Y:2025 | 03 | 2025 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,555 | $2,185 | n/a |
MS0437 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $272 | $2,237 | n/a |
MS0437 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $34,017 | $458,990 | n/a |
MS0437 # 01 Y:2024 | 01 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $147 | $0 | n/a |