Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsNAICS | 3339 | Other General Purpose Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0193 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $286 | $500 | Implemented |
WM0193 # 03 Y:2023 | 03 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $323 | $1,360 | Implemented |
WM0193 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,952 | $4,375 | Implemented |
WM0192 # 03 Y:2023 | 03 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,671 | $0 | Implemented |
WM0192 # 07 Y:2023 | 07 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $136 | $0 | Implemented |
WM0192 # 04 Y:2023 | 04 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,383 | $193 | Implemented |
WM0192 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,356 | $9,386 | Implemented |
WM0128 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,391 | $22,752 | Implemented |
WM0128 # 04 Y:2018 | 04 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,118 | $19,300 | Implemented |
WM0128 # 05 Y:2018 | 05 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,496 | $2,000 | Implemented |
WM0128 # 09 Y:2018 | 09 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $804 | $1,172 | Implemented |
WM0128 # 07 Y:2018 | 07 | 2018 | USE RADIANT HEATER FOR SPOT HEATING | $1,744 | $5,250 | Implemented |
WM0128 # 06 Y:2018 | 06 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,084 | $0 | Implemented |
WM0128 # 11 Y:2018 | 11 | 2018 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $637 | $740 | Implemented |
IA0518 # 02 Y:2014 | 02 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,232 | $5,280 | Implemented |
IA0518 # 09 Y:2014 | 09 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,803 | $2,302 | Implemented |
IA0518 # 08 Y:2014 | 08 | 2014 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $462 | $80 | Implemented |
IA0518 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,190 | $8,793 | Implemented |
IA0518 # 06 Y:2014 | 06 | 2014 | INSTALL OCCUPANCY SENSORS | $149 | $210 | Implemented |
IA0518 # 04 Y:2014 | 04 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $939 | $185 | Implemented |
IA0518 # 01 Y:2014 | 01 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,434 | $704 | Implemented |
WI0496 # 03 Y:2005 | 03 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $4,904 | $0 | Implemented |
WI0496 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,914 | $57,240 | Implemented |
WI0496 # 01 Y:2005 | 01 | 2005 | IMPROVE SPACE COMFORT CONDITIONING | $21,656 | $6,750 | Implemented |
WI0477 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $938 | $0 | Implemented |