Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,619
matching recommendationsNAICS | 3339 | Other General Purpose Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0484 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,596 | $58,450 | Not Implemented |
WV0484 # 02 Y:2014 | 02 | 2014 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $24,659 | $51,000 | Not Implemented |
WV0484 # 03 Y:2014 | 03 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $11,868 | $7,750 | Implemented |
WV0484 # 04 Y:2014 | 04 | 2014 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,987 | $3,690 | Not Implemented |
WV0484 # 05 Y:2014 | 05 | 2014 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,830 | $5,600 | Not Implemented |
WV0484 # 06 Y:2014 | 06 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,252 | $4,500 | Implemented |
WV0484 # 07 Y:2014 | 07 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,693 | $468 | Implemented |
WV0484 # 08 Y:2014 | 08 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,298 | $0 | Implemented |
WV0484 # 09 Y:2014 | 09 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,489 | $6,113 | Implemented |
BD0441 # 01 Y:2014 | 01 | 2014 | REPAIR AND ELIMINATE STEAM LEAKS | $3,813 | $2,600 | Implemented |
BD0441 # 02 Y:2014 | 02 | 2014 | INSTALL OCCUPANCY SENSORS | $273 | $450 | Not Implemented |
BD0441 # 03 Y:2014 | 03 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $505 | $20 | Not Implemented |
BD0441 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $300 | $280 | Implemented |
BD0441 # 05 Y:2014 | 05 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,765 | $3,000 | Implemented |
BD0441 # 06 Y:2014 | 06 | 2014 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $4,867 | $83 | Not Implemented |
BD0441 # 07 Y:2014 | 07 | 2014 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $4,000 | $900 | Implemented |
BD0441 # 08 Y:2014 | 08 | 2014 | CHANGE OPERATING CONDITIONS | $1,402 | $30 | Implemented |
MZ0116 # 01 Y:2013 | 01 | 2013 | USE PHOTOCELL CONTROLS | $2,023 | $900 | Not Implemented |
MZ0116 # 02 Y:2013 | 02 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $10,131 | $0 | Not Implemented |
MZ0116 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $890 | $1,000 | Not Implemented |
MZ0116 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,715 | $93,750 | Not Implemented |
MZ0116 # 05 Y:2013 | 05 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,431 | $1,160 | Not Implemented |
UK1314 # 01 Y:2013 | 01 | 2013 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $12,434 | $44,000 | Implemented |
UK1314 # 02 Y:2013 | 02 | 2013 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,512 | $28,560 | Implemented |
UK1314 # 03 Y:2013 | 03 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,739 | $4,500 | Implemented |