IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

101

matching recommendations
Reset
NAICS 3339 Other General Purpose Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0812 # 06 Y:2011 06 2011 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $12,936 $21,477 Not Implemented
OK0812 # 07 Y:2011 07 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,301 $7,605 Not Implemented
OK0812 # 08 Y:2011 08 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,925 $14,300 Implemented
OK0812 # 09 Y:2011 09 2011 INSTALL TIMERS AND/OR THERMOSTATS $801 $353 Implemented
OK0812 # 10 Y:2011 10 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,148 $7,130 Not Implemented
OK0743 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $22,720 $5,010 Implemented
OK0743 # 02 Y:2007 02 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,189 $569 Implemented
OK0743 # 03 Y:2007 03 2007 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $642 $6,000 Implemented
OK0743 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,598 $3,500 Implemented
OK0743 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $21,613 $2,450 Implemented
OK0743 # 06 Y:2007 06 2007 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $24,607 $0 Not Implemented
OK0743 # 07 Y:2007 07 2007 INSULATE BARE EQUIPMENT $5,413 $723 Implemented
OK0720 # 01 Y:2006 01 2006 USE OPTIMUM TEMPERATURE $10,475 $1,000 Implemented
OK0720 # 02 Y:2006 02 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $10,780 $4,636 Implemented
OK0720 # 03 Y:2006 03 2006 INCREASE USE OF AUTOMATION $10,975 $6,000 Not Implemented
OK0720 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $786 $5,290 Implemented
OK0720 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,282 $9,940 Implemented
OK0720 # 06 Y:2006 06 2006 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $5,200 $0 Implemented
OK0715 # 01 Y:2005 01 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,938 $3,936 Not Implemented
OK0715 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,111 $918 Not Implemented
OK0715 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,522 $5,175 Not Implemented
OK0715 # 04 Y:2005 04 2005 SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS $804 $1,825 Not Implemented
OK0715 # 05 Y:2005 05 2005 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $7,665 $47,100 Not Implemented
OK0715 # 06 Y:2005 06 2005 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,022 $608 Not Implemented
OK0715 # 07 Y:2005 07 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $472 $1,000 Not Implemented