Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
101
matching recommendationsNAICS | 3339 | Other General Purpose Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0715 # 08 Y:2005 | 08 | 2005 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $5,361 | $26,590 | Not Implemented |
OK0715 # 09 Y:2005 | 09 | 2005 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $20,968 | $0 | Not Implemented |
OK0714 # 01 Y:2005 | 01 | 2005 | USE POWER DURING OFF-PEAK PERIODS | $1,866 | $0 | Not Implemented |
OK0714 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $56,721 | $117,780 | Implemented |
OK0714 # 03 Y:2005 | 03 | 2005 | USE COMPRESSOR AIR FILTERS | $4,058 | $920 | Implemented |
OK0714 # 04 Y:2005 | 04 | 2005 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $8,299 | $70 | Implemented |
OK0714 # 05 Y:2005 | 05 | 2005 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $10,600 | $0 | Implemented |
OK0714 # 06 Y:2005 | 06 | 2005 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $70,215 | $3,931 | Not Implemented |
OK0675 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $274 | $256 | Implemented |
OK0675 # 02 Y:2003 | 02 | 2003 | INSTALL OCCUPANCY SENSORS | $124 | $231 | Not Implemented |
OK0675 # 03 Y:2003 | 03 | 2003 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $4,171 | $2,000 | Implemented |
OK0675 # 04 Y:2003 | 04 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,210 | $2,000 | Not Implemented |
OK0675 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $565 | $367 | Implemented |
OK0675 # 06 Y:2003 | 06 | 2003 | OPTIMIZE PLANT POWER FACTOR | $428 | $2,730 | Not Implemented |
OK0675 # 07 Y:2003 | 07 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,672 | $2,173 | Not Implemented |
OK0675 # 08 Y:2003 | 08 | 2003 | INSTALL SET-BACK TIMERS | $1,993 | $0 | Not Implemented |
OK0675 # 09 Y:2003 | 09 | 2003 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $14,350 | $23,640 | Not Implemented |
OK0675 # 10 Y:2003 | 10 | 2003 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $61,378 | $3,000 | Not Implemented |
OK0675 # 11 Y:2003 | 11 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $668 | $287 | Not Implemented |
OK0669 # 01 Y:2003 | 01 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $79,727 | $15,485 | Not Implemented |
OK0669 # 02 Y:2003 | 02 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,435 | $8,500 | Implemented |
OK0669 # 03 Y:2003 | 03 | 2003 | OPTIMIZE PLANT POWER FACTOR | $19,611 | $12,000 | n/a |
OK0669 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,626 | $3,500 | Implemented |
OK0669 # 05 Y:2003 | 05 | 2003 | INSTALL OCCUPANCY SENSORS | $1,966 | $3,467 | Implemented |
OK0669 # 06 Y:2003 | 06 | 2003 | INSTALL SET-BACK TIMERS | $1,069 | $463 | Implemented |