IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
NAICS 3339 Other General Purpose Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0672 # 02 Y:2024 02 2024 USE EVAPORATION TO CONCENTRATE MATERIAL $24,278 $31,216 n/a
WV0672 # 01 Y:2024 01 2024 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $73,416 $271,368 n/a
WV0672 # 13 Y:2024 13 2024 INSTALL OCCUPANCY SENSORS $334 $984 n/a
WV0672 # 12 Y:2024 12 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $401 $38 n/a
WV0672 # 11 Y:2024 11 2024 OPTIMIZE PLANT POWER FACTOR $596 $2,964 n/a
WV0672 # 10 Y:2024 10 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $797 $1,579 n/a
WV0672 # 09 Y:2024 09 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,102 $753 n/a
WV0672 # 08 Y:2024 08 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,640 $5,016 n/a
WV0672 # 07 Y:2024 07 2024 UPGRADE CONTROLS ON COMPRESSORS $3,058 $6,936 n/a
WV0672 # 06 Y:2024 06 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,489 $5,659 n/a
WV0672 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,087 $759 n/a
WV0672 # 04 Y:2024 04 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,264 $9,760 n/a
WV0672 # 03 Y:2024 03 2024 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $20,948 $26,406 n/a
WV0414 # 14 Y:2010 14 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $388 $1,735 Implemented
WV0414 # 12 Y:2010 12 2010 DEVELOP A REPAIR/REPLACE POLICY $1,318 $740 Implemented
WV0414 # 11 Y:2010 11 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,335 $1,070 Implemented
WV0414 # 10 Y:2010 10 2010 RECOVER MECHANICAL ENERGY $1,362 $1,000 Implemented
WV0414 # 09 Y:2010 09 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,409 $835 Not Implemented
WV0414 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,467 $3,614 Implemented
WV0414 # 07 Y:2010 07 2010 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,505 $14,000 Not Implemented
WV0414 # 06 Y:2010 06 2010 USE RADIANT HEATER FOR SPOT HEATING $3,403 $5,310 Not Implemented
WV0414 # 05 Y:2010 05 2010 RECOVER WASTE HEAT FROM EQUIPMENT $3,414 $400 Not Implemented
WV0414 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,064 $15,400 Not Implemented
WV0414 # 03 Y:2010 03 2010 REDUCE FLUID FLOW RATES $7,185 $280 Implemented
WV0414 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,304 $42,420 Implemented