Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
38
matching recommendationsNAICS | 3339 | Other General Purpose Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0680 # 02 Y:2025 | 02 | 2025 | INSULATE BARE EQUIPMENT | $19,535 | $2,495 | n/a |
WV0680 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $71,035 | $115,528 | n/a |
WV0680 # 11 Y:2025 | 11 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $388 | $424 | n/a |
WV0680 # 10 Y:2025 | 10 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,146 | $1,082 | n/a |
WV0680 # 09 Y:2025 | 09 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,296 | $5,010 | n/a |
WV0680 # 08 Y:2025 | 08 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,314 | $1,343 | n/a |
WV0680 # 07 Y:2025 | 07 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,360 | $4,307 | n/a |
WV0680 # 06 Y:2025 | 06 | 2025 | INSTALL OCCUPANCY SENSORS | $1,628 | $5,289 | n/a |
WV0680 # 05 Y:2025 | 05 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $2,106 | $5,245 | n/a |
WV0680 # 04 Y:2025 | 04 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,835 | $33,120 | n/a |
WV0680 # 03 Y:2025 | 03 | 2025 | REDUCE VENTILATION AIR | $13,841 | $6,504 | n/a |
WV0672 # 13 Y:2024 | 13 | 2024 | INSTALL OCCUPANCY SENSORS | $334 | $984 | Implemented |
WV0672 # 12 Y:2024 | 12 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $401 | $38 | Implemented |
WV0672 # 03 Y:2024 | 03 | 2024 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $20,948 | $26,406 | Not Implemented |
WV0672 # 11 Y:2024 | 11 | 2024 | OPTIMIZE PLANT POWER FACTOR | $596 | $2,964 | Not Implemented |
WV0672 # 10 Y:2024 | 10 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $797 | $1,579 | Implemented |
WV0672 # 09 Y:2024 | 09 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,102 | $753 | Not Implemented |
WV0672 # 08 Y:2024 | 08 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,640 | $5,016 | Implemented |
WV0672 # 07 Y:2024 | 07 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $3,058 | $6,936 | Not Implemented |
WV0672 # 06 Y:2024 | 06 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,489 | $5,659 | Implemented |
WV0672 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,087 | $759 | Implemented |
WV0672 # 04 Y:2024 | 04 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,264 | $9,760 | Not Implemented |
WV0672 # 02 Y:2024 | 02 | 2024 | USE EVAPORATION TO CONCENTRATE MATERIAL | $24,278 | $31,216 | Not Implemented |
WV0672 # 01 Y:2024 | 01 | 2024 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $73,416 | $271,368 | Not Implemented |
WV0414 # 01 Y:2010 | 01 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $22,889 | $18,300 | Not Implemented |