Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
56
matching recommendationsNAICS | 3339 | Other General Purpose Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0562 # 05 Y:2020 | 05 | 2020 | INSTALL OCCUPANCY SENSORS | $2,645 | $4,780 | Implemented |
UF0562 # 03 Y:2020 | 03 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,271 | $0 | Implemented |
UF0562 # 02 Y:2020 | 02 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $11,635 | $4,086 | Implemented |
UF0562 # 01 Y:2020 | 01 | 2020 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $30,571 | $24,600 | Not Implemented |
UF0562 # 04 Y:2020 | 04 | 2020 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $3,128 | $7,733 | Not Implemented |
UF0562 # 06 Y:2020 | 06 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,545 | $1,778 | Implemented |
UF0562 # 07 Y:2020 | 07 | 2020 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $2,484 | $2,380 | Not Implemented |
UF0562 # 08 Y:2020 | 08 | 2020 | USE PHOTOCELL CONTROLS | $904 | $0 | Implemented |
CL2015 # 01 Y:2020 | 01 | 2020 | MODIFY STARTUP/SHUTDOWN TIMES | $7,855 | $550 | Not Implemented |
CL2015 # 02 Y:2020 | 02 | 2020 | USE OPTIMUM TEMPERATURE | $17,243 | $0 | Not Implemented |
CL2015 # 03 Y:2020 | 03 | 2020 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $53 | $0 | Not Implemented |
CL2015 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,229 | $4,600 | Not Implemented |
OK1034 # 04 Y:2020 | 04 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $536 | $713 | Not Implemented |
OK1034 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,909 | $49,013 | Implemented |
OK1034 # 02 Y:2020 | 02 | 2020 | OPTIMIZE PLANT POWER FACTOR | $8,582 | $18,054 | Not Implemented |
OK1034 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,014 | $2,340 | Not Implemented |
OK1034 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,763 | $4,560 | Implemented |
OK1034 # 05 Y:2020 | 05 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $459 | $320 | Implemented |
OK1034 # 06 Y:2020 | 06 | 2020 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,799 | $0 | Implemented |
NC0653 # 02 Y:2020 | 02 | 2020 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $22,483 | $4,000 | Not Implemented |
NC0653 # 01 Y:2020 | 01 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $19,814 | $4,460 | Not Implemented |
NC0653 # 03 Y:2020 | 03 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $382,429 | $2,300,000 | Not Implemented |
UA0229 # 06 Y:2020 | 06 | 2020 | INSTALL OCCUPANCY SENSORS | $10,455 | $14,400 | Not Implemented |
UA0229 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,562 | $6,700 | Implemented |
UA0229 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,905 | $2,000 | Implemented |