Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
35
matching recommendationsNAICS | 33391 | Pump and Compressor Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1058 # 01 Y:2023 | 01 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $23,188 | $0 | Not Implemented |
UD1058 # 06 Y:2023 | 06 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,653 | $1,115 | Not Implemented |
UD1058 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,307 | $29,827 | Implemented |
UD1058 # 08 Y:2023 | 08 | 2023 | INSTALL OCCUPANCY SENSORS | $949 | $290 | Not Implemented |
UD1058 # 02 Y:2023 | 02 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $282 | $0 | Implemented |
UD1058 # 03 Y:2023 | 03 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $329 | $0 | Not Implemented |
UD1058 # 04 Y:2023 | 04 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,990 | $11,117 | Not Implemented |
UD1058 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,636 | $952 | Implemented |
UD0985 # 03 Y:2018 | 03 | 2018 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $957 | $2,500 | Implemented |
UD0985 # 07 Y:2018 | 07 | 2018 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $30,420 | $25,000 | Implemented |
UD0985 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,998 | $55,816 | Implemented |
UD0985 # 05 Y:2018 | 05 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $320 | $1,500 | Not Implemented |
UD0985 # 04 Y:2018 | 04 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $938 | $0 | Not Implemented |
UD0985 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,260 | $1,000 | Implemented |
UD0985 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,113 | $0 | Implemented |
UD0922 # 01 Y:2015 | 01 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $31,816 | $0 | Not Implemented |
UD0922 # 11 Y:2015 | 11 | 2015 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $10,020 | $0 | Not Implemented |
UD0922 # 10 Y:2015 | 10 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $39,230 | $67,300 | Not Implemented |
UD0922 # 09 Y:2015 | 09 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,813 | $1,000 | Not Implemented |
UD0922 # 08 Y:2015 | 08 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,944 | $1,500 | Not Implemented |
UD0922 # 07 Y:2015 | 07 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $11,367 | $0 | Not Implemented |
UD0922 # 06 Y:2015 | 06 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $61,348 | $65,000 | Not Implemented |
UD0922 # 05 Y:2015 | 05 | 2015 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $33,724 | $600 | Not Implemented |
UD0922 # 04 Y:2015 | 04 | 2015 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $103,649 | $29,400 | Not Implemented |
UD0922 # 03 Y:2015 | 03 | 2015 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $122 | $140 | Not Implemented |