Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
NAICS 33391 Pump and Compressor Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1058 # 01 Y:2023 01 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $23,188 $0 Not Implemented
UD1058 # 06 Y:2023 06 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,653 $1,115 Not Implemented
UD1058 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,307 $29,827 Implemented
UD1058 # 08 Y:2023 08 2023 INSTALL OCCUPANCY SENSORS $949 $290 Not Implemented
UD1058 # 02 Y:2023 02 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $282 $0 Implemented
UD1058 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $329 $0 Not Implemented
UD1058 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,990 $11,117 Not Implemented
UD1058 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,636 $952 Implemented
UD0985 # 03 Y:2018 03 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $957 $2,500 Implemented
UD0985 # 07 Y:2018 07 2018 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $30,420 $25,000 Implemented
UD0985 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,998 $55,816 Implemented
UD0985 # 05 Y:2018 05 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $320 $1,500 Not Implemented
UD0985 # 04 Y:2018 04 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $938 $0 Not Implemented
UD0985 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,260 $1,000 Implemented
UD0985 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,113 $0 Implemented
UD0922 # 01 Y:2015 01 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $31,816 $0 Not Implemented
UD0922 # 11 Y:2015 11 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,020 $0 Not Implemented
UD0922 # 10 Y:2015 10 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $39,230 $67,300 Not Implemented
UD0922 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,813 $1,000 Not Implemented
UD0922 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $7,944 $1,500 Not Implemented
UD0922 # 07 Y:2015 07 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $11,367 $0 Not Implemented
UD0922 # 06 Y:2015 06 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $61,348 $65,000 Not Implemented
UD0922 # 05 Y:2015 05 2015 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $33,724 $600 Not Implemented
UD0922 # 04 Y:2015 04 2015 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $103,649 $29,400 Not Implemented
UD0922 # 03 Y:2015 03 2015 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $122 $140 Not Implemented