IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

497

matching recommendations
Reset
NAICS 33392 Material Handling Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0075 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,771 $1,152 Implemented
TT0075 # 08 Y:2011 08 2011 ISOLATE HOT OR COLD EQUIPMENT $1,379 $2,500 Implemented
TT0075 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,369 $5,436 Not Implemented
TT0070 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,235 $0 Not Implemented
TT0070 # 02 Y:2011 02 2011 INSULATE BARE EQUIPMENT $7,025 $2,100 Not Implemented
TT0070 # 03 Y:2011 03 2011 UPGRADE CONTROLS ON COMPRESSORS $1,990 $1,600 Not Implemented
TT0070 # 04 Y:2011 04 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $875 $1,200 Not Implemented
TT0070 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,337 $21,600 Not Implemented
TT0070 # 06 Y:2011 06 2011 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $1,730 $4,900 Not Implemented
TT0070 # 07 Y:2011 07 2011 OPTIMIZE PLANT POWER FACTOR $6,582 $32,600 Not Implemented
TT0070 # 08 Y:2011 08 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $11,486 $102,000 Not Implemented
TT0070 # 09 Y:2011 09 2011 DEVELOP A REPAIR/REPLACE POLICY $5,985 $1,347 Not Implemented
CO0645 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,890 $1,290 Implemented
CO0645 # 02 Y:2011 02 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $630 $3,010 Not Implemented
CO0645 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,950 $33,510 Implemented
CO0645 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,930 $5,260 Not Implemented
CO0645 # 05 Y:2011 05 2011 USE SOLAR HEAT TO MAKE ELECTRICTY $2,000 $21,500 Not Implemented
CO0645 # 06 Y:2011 06 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,560 $7,980 Not Implemented
CO0645 # 07 Y:2011 07 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $160 $200 Implemented
UA0054 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $31,442 $1,000 Not Implemented
UA0054 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,010 $7,000 Implemented
UA0054 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $86,265 $71,625 Not Implemented
UA0054 # 04 Y:2010 04 2010 USE PHOTOCELL CONTROLS $2,443 $1,893 Not Implemented
UA0054 # 05 Y:2010 05 2010 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $42,638 $40,400 Not Implemented
UA0054 # 06 Y:2010 06 2010 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $25,338 $6,850 Not Implemented