IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

477

matching recommendations
Reset
NAICS 33392 Material Handling Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0278 # 06 Y:2008 06 2008 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $8,828 $7,000 Implemented
LE0278 # 07 Y:2008 07 2008 RECOVER WASTE HEAT FROM EQUIPMENT $6,783 $7,000 Not Implemented
LE0278 # 08 Y:2008 08 2008 USE OPTIMUM TEMPERATURE $7,669 $500 Not Implemented
LE0278 # 09 Y:2008 09 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,894 $304 Not Implemented
LE0278 # 10 Y:2008 10 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,764 $800 Not Implemented
LE0278 # 11 Y:2008 11 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,195 $1,824 Implemented
LE0278 # 12 Y:2008 12 2008 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,387 $3,290 Not Implemented
LE0278 # 13 Y:2008 13 2008 INSTALL TIMERS AND/OR THERMOSTATS $1,785 $450 Implemented
LE0278 # 14 Y:2008 14 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52,373 $142,010 Implemented
BD0344 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,551 $474 Not Implemented
BD0344 # 02 Y:2008 02 2008 USE PHOTOCELL CONTROLS $3,786 $991 Not Implemented
BD0344 # 03 Y:2008 03 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,657 $1,021 Not Implemented
BD0344 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,483 $101 Not Implemented
BD0344 # 05 Y:2008 05 2008 RECOVER WASTE HEAT FROM EQUIPMENT $75,203 $20,001 Not Implemented
BD0344 # 06 Y:2008 06 2008 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $15,215 $7,501 Not Implemented
BD0344 # 07 Y:2008 07 2008 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $43,004 $11,201 Not Implemented
BD0344 # 08 Y:2008 08 2008 USE RADIANT HEATER FOR SPOT HEATING $16,854 $27,001 Not Implemented
UF0394 # 01 Y:2006 01 2006 INSULATE BARE EQUIPMENT $1,756 $1,706 Implemented
UF0394 # 02 Y:2006 02 2006 OPTIMIZE PLANT POWER FACTOR $145,983 $20,000 Not Implemented
UF0394 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,287 $810 Implemented
UF0394 # 04 Y:2006 04 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,147 $33,136 Not Implemented
UF0394 # 05 Y:2006 05 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,956 $0 Implemented
UF0394 # 06 Y:2006 06 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,473 $24,457 Not Implemented
UF0394 # 07 Y:2006 07 2006 LOWER CEILING TO REDUCE CONDITIONED SPACE $12,995 $1,250 Not Implemented
UF0394 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,450 $2,219 Not Implemented