Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

483

matching recommendations
Reset
NAICS 33392 Material Handling Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0843 # 03 Y:2022 03 2022 COMBINE UTILITY METERS $7,115 $4,500 Not Implemented
AM0843 # 02 Y:2022 02 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,030 $110 Not Implemented
AM0843 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $18,385 $33,511 Not Implemented
AS0502 # 08 Y:2021 08 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $168 $375 Implemented
AS0502 # 07 Y:2021 07 2021 INSTALL OCCUPANCY SENSORS $350 $1,131 Not Implemented
AS0502 # 06 Y:2021 06 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $359 $793 Implemented
AS0502 # 05 Y:2021 05 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $393 $1,127 Implemented
AS0502 # 04 Y:2021 04 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $672 $284 Not Implemented
AS0502 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,685 $2,400 Not Implemented
AS0502 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,703 $13,532 Implemented
AS0502 # 01 Y:2021 01 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,647 $200 Not Implemented
OK1034 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,909 $49,013 Implemented
OK1034 # 02 Y:2020 02 2020 OPTIMIZE PLANT POWER FACTOR $8,582 $18,054 Not Implemented
OK1034 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,014 $2,340 Not Implemented
OK1034 # 04 Y:2020 04 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $536 $713 Not Implemented
OK1034 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $459 $320 Implemented
OK1034 # 06 Y:2020 06 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,799 $0 Implemented
OK1034 # 07 Y:2020 07 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,763 $4,560 Implemented
UA0229 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,905 $2,000 Implemented
UA0229 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,562 $6,700 Implemented
UA0229 # 03 Y:2020 03 2020 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $27,038 $15,000 Not Implemented
UA0229 # 04 Y:2020 04 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $78,540 $5,000 Not Implemented
UA0229 # 06 Y:2020 06 2020 INSTALL OCCUPANCY SENSORS $10,455 $14,400 Not Implemented
UA0229 # 05 Y:2020 05 2020 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $9,688 $11,100 Not Implemented
OK1018 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $44,286 $21,990 Not Implemented