IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

483

matching recommendations
Reset
NAICS 33392 Material Handling Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0897 # 04 Y:2014 04 2014 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $248 $0 Implemented
OK0897 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,000 $10,067 Implemented
OK0897 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,792 $1,656 Implemented
WV0484 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,596 $58,450 Not Implemented
WV0484 # 02 Y:2014 02 2014 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $24,659 $51,000 Not Implemented
WV0484 # 03 Y:2014 03 2014 UPGRADE CONTROLS ON COMPRESSORS $11,868 $7,750 Implemented
WV0484 # 04 Y:2014 04 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,987 $3,690 Not Implemented
WV0484 # 05 Y:2014 05 2014 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,830 $5,600 Not Implemented
WV0484 # 06 Y:2014 06 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,252 $4,500 Implemented
WV0484 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,693 $468 Implemented
WV0484 # 08 Y:2014 08 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,298 $0 Implemented
WV0484 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,489 $6,113 Implemented
BD0441 # 01 Y:2014 01 2014 REPAIR AND ELIMINATE STEAM LEAKS $3,813 $2,600 Implemented
BD0441 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $273 $450 Not Implemented
BD0441 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $505 $20 Not Implemented
BD0441 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $300 $280 Implemented
BD0441 # 05 Y:2014 05 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,765 $3,000 Implemented
BD0441 # 06 Y:2014 06 2014 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $4,867 $83 Not Implemented
BD0441 # 07 Y:2014 07 2014 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $4,000 $900 Implemented
BD0441 # 08 Y:2014 08 2014 CHANGE OPERATING CONDITIONS $1,402 $30 Implemented
DL0110 # 01 Y:2013 01 2013 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $7,313 $39,750 Not Implemented
DL0110 # 02 Y:2013 02 2013 INSTALL TIMERS AND/OR THERMOSTATS $6,320 $260 Implemented
DL0110 # 03 Y:2013 03 2013 UPGRADE CONTROLS ON COMPRESSORS $10,321 $35,000 Not Implemented
DL0110 # 04 Y:2013 04 2013 REDUCE VENTILATION AIR $4,577 $102 Not Implemented
DL0110 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,720 $24,800 Not Implemented