IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
NAICS 33392 Material Handling Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1118 # 07 Y:2024 07 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,952 $9,900 n/a
OK1118 # 04 Y:2024 04 2024 OPTIMIZE PLANT POWER FACTOR $816 $4,683 n/a
OK1118 # 02 Y:2024 02 2024 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $772 $450 n/a
OK1118 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $20,756 $102,600 n/a
OK1118 # 06 Y:2024 06 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,488 $25,000 n/a
OK1118 # 05 Y:2024 05 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $11,355 $382,780 n/a
OK1118 # 03 Y:2024 03 2024 COMBINE UTILITY METERS $453 $2,200 n/a
OK0903 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,183 $950 Implemented
OK0903 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $3,490 $2,440 Not Implemented
OK0903 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $2,170 $8,887 Not Implemented
OK0903 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,717 $11,876 Not Implemented
OK0903 # 05 Y:2015 05 2015 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $407 $1,125 Not Implemented
OK0903 # 04 Y:2015 04 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,633 $30,000 Implemented
OK0903 # 03 Y:2015 03 2015 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $3,411 $228 Implemented
OK0903 # 02 Y:2015 02 2015 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $96,611 $20,611 Implemented
OK0903 # 01 Y:2015 01 2015 INSTALL SET-BACK TIMERS $28,117 $86 Not Implemented
OK0903 # 10 Y:2015 10 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,904 $10,062 Implemented
OK0903 # 11 Y:2015 11 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,427 $2,112 Not Implemented
OK0903 # 12 Y:2015 12 2015 INSULATE BARE EQUIPMENT $195 $240 Not Implemented
OK0714 # 06 Y:2005 06 2005 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $70,215 $3,931 Not Implemented
OK0714 # 05 Y:2005 05 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $10,600 $0 Implemented
OK0714 # 04 Y:2005 04 2005 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,299 $70 Implemented
OK0714 # 03 Y:2005 03 2005 USE COMPRESSOR AIR FILTERS $4,058 $920 Implemented
OK0714 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $56,721 $117,780 Implemented
OK0714 # 01 Y:2005 01 2005 USE POWER DURING OFF-PEAK PERIODS $1,866 $0 Not Implemented