Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsNAICS | 33392 | Material Handling Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0542 # 13 Y:2017 | 13 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $926 | $100 | Implemented |
WV0542 # 12 Y:2017 | 12 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $955 | $2,135 | Implemented |
WV0542 # 11 Y:2017 | 11 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $963 | $940 | Implemented |
WV0542 # 10 Y:2017 | 10 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,131 | $883 | Implemented |
WV0542 # 09 Y:2017 | 09 | 2017 | MINIMIZE WATER USAGE | $2,251 | $7,000 | Implemented |
WV0542 # 08 Y:2017 | 08 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,984 | $9,625 | Implemented |
WV0542 # 07 Y:2017 | 07 | 2017 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $3,828 | $1,800 | Not Implemented |
WV0542 # 06 Y:2017 | 06 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,665 | $0 | Implemented |
WV0542 # 05 Y:2017 | 05 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,681 | $2,700 | Implemented |
WV0542 # 04 Y:2017 | 04 | 2017 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $4,841 | $16,500 | Not Implemented |
WV0542 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,056 | $765 | Implemented |
WV0542 # 02 Y:2017 | 02 | 2017 | INSTALL OCCUPANCY SENSORS | $5,206 | $5,330 | Implemented |
WV0542 # 01 Y:2017 | 01 | 2017 | USE EVAPORATION TO CONCENTRATE MATERIAL | $9,150 | $45,000 | Not Implemented |
WV0542 # 14 Y:2017 | 14 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $881 | $2,150 | Not Implemented |
WV0542 # 15 Y:2017 | 15 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $48 | $105 | Not Implemented |
LE0278 # 01 Y:2008 | 01 | 2008 | UPGRADE OBSOLETE EQUIPMENT | $94,158 | $132,748 | Not Implemented |
LE0278 # 13 Y:2008 | 13 | 2008 | INSTALL TIMERS AND/OR THERMOSTATS | $1,785 | $450 | Implemented |
LE0278 # 12 Y:2008 | 12 | 2008 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $2,387 | $3,290 | Not Implemented |
LE0278 # 11 Y:2008 | 11 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,195 | $1,824 | Implemented |
LE0278 # 09 Y:2008 | 09 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,894 | $304 | Not Implemented |
LE0278 # 08 Y:2008 | 08 | 2008 | USE OPTIMUM TEMPERATURE | $7,669 | $500 | Not Implemented |
LE0278 # 06 Y:2008 | 06 | 2008 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $8,828 | $7,000 | Implemented |
LE0278 # 05 Y:2008 | 05 | 2008 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $10,716 | $1,200 | Not Implemented |
LE0278 # 04 Y:2008 | 04 | 2008 | INSTALL TIMERS AND/OR THERMOSTATS | $12,408 | $9,600 | Not Implemented |
LE0278 # 03 Y:2008 | 03 | 2008 | USE RADIANT HEATER FOR SPOT HEATING | $17,728 | $16,000 | Not Implemented |