Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
47
matching recommendationsNAICS | 33392 | Material Handling Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0373 # 04 Y:2005 | 04 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,473 | $1,147 | Implemented |
IA0373 # 09 Y:2005 | 09 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $9,792 | $6,208 | Implemented |
IA0373 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,881 | $359 | Implemented |
IA0373 # 03 Y:2005 | 03 | 2005 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $1,412 | $143 | Implemented |
IA0373 # 01 Y:2005 | 01 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,447 | $94 | Not Implemented |
IA0373 # 08 Y:2005 | 08 | 2005 | INSTALL OCCUPANCY SENSORS | $1,668 | $1,925 | Not Implemented |
IA0373 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,784 | $2,706 | Implemented |
IA0373 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,460 | $12,810 | Implemented |
IA0373 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,419 | $5,844 | Implemented |
OK0714 # 06 Y:2005 | 06 | 2005 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $70,215 | $3,931 | Not Implemented |
OK0714 # 05 Y:2005 | 05 | 2005 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $10,600 | $0 | Implemented |
OK0714 # 01 Y:2005 | 01 | 2005 | USE POWER DURING OFF-PEAK PERIODS | $1,866 | $0 | Not Implemented |
OK0714 # 03 Y:2005 | 03 | 2005 | USE COMPRESSOR AIR FILTERS | $4,058 | $920 | Implemented |
OK0714 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $56,721 | $117,780 | Implemented |
OK0714 # 04 Y:2005 | 04 | 2005 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $8,299 | $70 | Implemented |
UD0724 # 11 Y:2005 | 11 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $471 | $880 | Implemented |
UD0724 # 10 Y:2005 | 10 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,915 | $0 | Not Implemented |
UD0724 # 09 Y:2005 | 09 | 2005 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $3,364 | $0 | Implemented |
UD0724 # 08 Y:2005 | 08 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,477 | $0 | Not Implemented |
UD0724 # 07 Y:2005 | 07 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,199 | $7,500 | Not Implemented |
UD0724 # 06 Y:2005 | 06 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,922 | $4,800 | Not Implemented |
UD0724 # 05 Y:2005 | 05 | 2005 | SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS | $9,550 | $530 | Not Implemented |
UD0724 # 04 Y:2005 | 04 | 2005 | INSULATE BARE EQUIPMENT | $13,563 | $6,505 | Implemented |
UD0724 # 03 Y:2005 | 03 | 2005 | USE PHOTOCELL CONTROLS | $16,400 | $0 | Implemented |
UD0724 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,240 | $102,000 | Not Implemented |