Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsNAICS | 33392 | Material Handling Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0897 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,440 | $1,188 | Implemented |
OK0897 # 03 Y:2014 | 03 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,796 | $2,066 | Implemented |
OK0897 # 04 Y:2014 | 04 | 2014 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $248 | $0 | Implemented |
OK0897 # 05 Y:2014 | 05 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,000 | $10,067 | Implemented |
OK0897 # 06 Y:2014 | 06 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,792 | $1,656 | Implemented |
OK0897 # 07 Y:2014 | 07 | 2014 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $13,545 | $3,641 | Implemented |
OK0897 # 01 Y:2014 | 01 | 2014 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $5,056 | $0 | Implemented |
WV0484 # 09 Y:2014 | 09 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,489 | $6,113 | Implemented |
WV0484 # 08 Y:2014 | 08 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,298 | $0 | Implemented |
WV0484 # 07 Y:2014 | 07 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,693 | $468 | Implemented |
WV0484 # 06 Y:2014 | 06 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,252 | $4,500 | Implemented |
WV0484 # 05 Y:2014 | 05 | 2014 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,830 | $5,600 | Not Implemented |
WV0484 # 04 Y:2014 | 04 | 2014 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,987 | $3,690 | Not Implemented |
WV0484 # 03 Y:2014 | 03 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $11,868 | $7,750 | Implemented |
WV0484 # 02 Y:2014 | 02 | 2014 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $24,659 | $51,000 | Not Implemented |
WV0484 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,596 | $58,450 | Not Implemented |
BD0441 # 08 Y:2014 | 08 | 2014 | CHANGE OPERATING CONDITIONS | $1,402 | $30 | Implemented |
BD0441 # 07 Y:2014 | 07 | 2014 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $4,000 | $900 | Implemented |
BD0441 # 06 Y:2014 | 06 | 2014 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $4,867 | $83 | Not Implemented |
BD0441 # 05 Y:2014 | 05 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,765 | $3,000 | Implemented |
BD0441 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $300 | $280 | Implemented |
BD0441 # 03 Y:2014 | 03 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $505 | $20 | Not Implemented |
BD0441 # 02 Y:2014 | 02 | 2014 | INSTALL OCCUPANCY SENSORS | $273 | $450 | Not Implemented |
BD0441 # 01 Y:2014 | 01 | 2014 | REPAIR AND ELIMINATE STEAM LEAKS | $3,813 | $2,600 | Implemented |