IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

118

matching recommendations
Reset
NAICS 333923 Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0542 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,984 $9,625 Implemented
WV0542 # 15 Y:2017 15 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $48 $105 Not Implemented
WV0542 # 09 Y:2017 09 2017 MINIMIZE WATER USAGE $2,251 $7,000 Implemented
WV0542 # 11 Y:2017 11 2017 DEVELOP A REPAIR/REPLACE POLICY $963 $940 Implemented
WV0542 # 14 Y:2017 14 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $881 $2,150 Not Implemented
WV0542 # 04 Y:2017 04 2017 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $4,841 $16,500 Not Implemented
WV0542 # 13 Y:2017 13 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $926 $100 Implemented
WV0542 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $5,206 $5,330 Implemented
WV0542 # 05 Y:2017 05 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,681 $2,700 Implemented
WV0542 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,056 $765 Implemented
WV0542 # 01 Y:2017 01 2017 USE EVAPORATION TO CONCENTRATE MATERIAL $9,150 $45,000 Not Implemented
IP0046 # 01 Y:2015 01 2015 UPGRADE OBSOLETE EQUIPMENT $1,665 $4 Not Implemented
IP0046 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,302 $64 Not Implemented
IP0046 # 03 Y:2015 03 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $122 $117 Not Implemented
IP0046 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,526 $4,032 Not Implemented
IP0046 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $348 $512 Not Implemented
IP0046 # 06 Y:2015 06 2015 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $6,619 $10,141 Not Implemented
OK0903 # 05 Y:2015 05 2015 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $407 $1,125 Not Implemented
OK0903 # 12 Y:2015 12 2015 INSULATE BARE EQUIPMENT $195 $240 Not Implemented
OK0903 # 02 Y:2015 02 2015 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $96,611 $20,611 Implemented
OK0903 # 01 Y:2015 01 2015 INSTALL SET-BACK TIMERS $28,117 $86 Not Implemented
OK0903 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,183 $950 Implemented
OK0903 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $3,490 $2,440 Not Implemented
OK0903 # 11 Y:2015 11 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,427 $2,112 Not Implemented
OK0903 # 10 Y:2015 10 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,904 $10,062 Implemented