IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
NAICS 333923 Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0735 # 02 Y:2017 02 2017 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $8,320 $4,120 Not Implemented
AM0735 # 03 Y:2017 03 2017 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,770 $320 Implemented
AM0735 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $920 $1,700 Not Implemented
AM0735 # 05 Y:2017 05 2017 REUSE RAGS UNTIL COMPLETELY SOILED $880 $0 Implemented
AM0735 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,160 $500 Implemented
AM0735 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,105 $410 Implemented
AM0735 # 08 Y:2017 08 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $195 $15 Not Implemented
AM0735 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,250 $52,360 Implemented
SU0446 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $304 $234 Not Implemented
SU0446 # 06 Y:2017 06 2017 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $290 $854 Not Implemented
SU0446 # 05 Y:2017 05 2017 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $6,295 $18,204 Not Implemented
SU0446 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $170 $165 Implemented
SU0446 # 02 Y:2017 02 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,711 $7,161 Not Implemented
SU0446 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $1,759 $0 Implemented
WV0542 # 15 Y:2017 15 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $48 $105 Not Implemented
WV0542 # 14 Y:2017 14 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $881 $2,150 Not Implemented
WV0542 # 13 Y:2017 13 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $926 $100 Implemented
WV0542 # 12 Y:2017 12 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $955 $2,135 Implemented
WV0542 # 11 Y:2017 11 2017 DEVELOP A REPAIR/REPLACE POLICY $963 $940 Implemented
WV0542 # 10 Y:2017 10 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,131 $883 Implemented
WV0542 # 09 Y:2017 09 2017 MINIMIZE WATER USAGE $2,251 $7,000 Implemented
WV0542 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,984 $9,625 Implemented
WV0542 # 07 Y:2017 07 2017 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $3,828 $1,800 Not Implemented
WV0542 # 06 Y:2017 06 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,665 $0 Implemented
WV0542 # 05 Y:2017 05 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,681 $2,700 Implemented