IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

718

matching recommendations
Reset
NAICS 33399 All Other General Purpose Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL1805 # 03 Y:2018 03 2018 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $637 $2,500 Not Implemented
TT0197 # 01 Y:2017 01 2017 USE SOLAR HEAT TO MAKE ELECTRICTY $19,976 $72,881 Not Implemented
TT0197 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,919 $17,290 Not Implemented
TT0197 # 03 Y:2017 03 2017 APPLY FOR INVESTMENT INCENTIVES $31,640 $150 Implemented
TT0197 # 04 Y:2017 04 2017 OPTIMIZE PLANT POWER FACTOR $6,006 $10,000 Not Implemented
TT0197 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,267 $3,050 Not Implemented
SU0445 # 01 Y:2017 01 2017 DISCONNECT BALLASTS $122 $0 Implemented
SU0445 # 02 Y:2017 02 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,399 $3,850 Implemented
SU0445 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $368 $750 Implemented
SU0445 # 04 Y:2017 04 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $62 $237 Implemented
SU0445 # 05 Y:2017 05 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $430 $1,799 Implemented
SD0551 # 01 Y:2017 01 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $20,950 $86,400 Not Implemented
SD0551 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,959 $35,776 Implemented
SD0551 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $899 $3,000 Implemented
SD0551 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $433 $1,500 Implemented
SD0551 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $169 $200 Implemented
UF0506 # 01 Y:2017 01 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,263 $5,454 Not Implemented
UF0506 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,519 $1,169 Implemented
UF0506 # 03 Y:2017 03 2017 INSTALL COMMON HEADER ON COMPRESSORS $4,067 $3,216 Not Implemented
UF0506 # 04 Y:2017 04 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,070 $1,171 Not Implemented
UF0506 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,010 $6,500 Not Implemented
UF0506 # 06 Y:2017 06 2017 INSTALL SET-BACK TIMERS $1,014 $667 Implemented
UF0506 # 07 Y:2017 07 2017 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $60,000 $55,338 Not Implemented
NC0593 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,891 $81,460 Implemented
NC0593 # 02 Y:2017 02 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,060 $1,000 Implemented