Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
735
matching recommendationsNAICS | 33399 | All Other General Purpose Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0293 # 09 Y:2010 | 09 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $337 | $898 | Not Implemented |
SU0293 # 10 Y:2010 | 10 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $609 | $2,721 | Not Implemented |
SU0293 # 11 Y:2010 | 11 | 2010 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $24,796 | $150,000 | Not Implemented |
SU0293 # 12 Y:2010 | 12 | 2010 | UPGRADE OBSOLETE EQUIPMENT | $2,203 | $19,090 | Not Implemented |
NC0398 # 01 Y:2010 | 01 | 2010 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $35,525 | $20,000 | Implemented |
NC0398 # 02 Y:2010 | 02 | 2010 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $68,552 | $57,900 | Not Implemented |
NC0398 # 03 Y:2010 | 03 | 2010 | AIR CONDITION ONLY SPACE NECESSARY | $9,565 | $18,450 | Not Implemented |
NC0398 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,697 | $200 | Implemented |
NC0398 # 05 Y:2010 | 05 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,751 | $14,000 | Not Implemented |
NC0398 # 06 Y:2010 | 06 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,554 | $1,205 | Implemented |
NC0398 # 07 Y:2010 | 07 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $93,642 | $225,498 | Implemented |
UD0793 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,450 | $25,000 | Implemented |
UD0793 # 02 Y:2009 | 02 | 2009 | INSULATE BARE EQUIPMENT | $6,677 | $1,000 | Implemented |
UD0793 # 03 Y:2009 | 03 | 2009 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,960 | $500 | Not Implemented |
UD0793 # 04 Y:2009 | 04 | 2009 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $3,855 | $0 | Implemented |
UD0793 # 05 Y:2009 | 05 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,799 | $400 | Not Implemented |
UD0793 # 06 Y:2009 | 06 | 2009 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,114 | $0 | Implemented |
UD0793 # 07 Y:2009 | 07 | 2009 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,970 | $1,000 | Implemented |
UD0793 # 08 Y:2009 | 08 | 2009 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $2,460 | $2,500 | Implemented |
UD0793 # 09 Y:2009 | 09 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,488 | $0 | Implemented |
UD0793 # 10 Y:2009 | 10 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,256 | $4,820 | Not Implemented |
UD0793 # 11 Y:2009 | 11 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $621 | $1,000 | Implemented |
UD0793 # 12 Y:2009 | 12 | 2009 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $435 | $0 | Not Implemented |
IA0431 # 01 Y:2008 | 01 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $723 | $346 | Implemented |
IA0431 # 02 Y:2008 | 02 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $640 | $12 | Not Implemented |