IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

104

matching recommendations
Reset
NAICS 333995 Fluid Power Cylinder and Actuator Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CW0126 # 01 Y:2022 01 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $17,675 $20,960 n/a
CW0126 # 02 Y:2022 02 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $12,461 $15,547 n/a
CW0126 # 03 Y:2022 03 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $361 $0 n/a
CW0126 # 04 Y:2022 04 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $19,047 $54,963 n/a
CW0126 # 05 Y:2022 05 2022 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $10,872 $33,000 n/a
CW0126 # 06 Y:2022 06 2022 USE POWER DURING OFF-PEAK PERIODS $921 $0 n/a
CW0126 # 07 Y:2022 07 2022 USE SOLAR HEAT FOR HEAT $2,171 $13,500 n/a
NC0653 # 02 Y:2020 02 2020 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $22,483 $4,000 Not Implemented
NC0653 # 03 Y:2020 03 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $382,429 $2,300,000 Not Implemented
NC0653 # 01 Y:2020 01 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $19,814 $4,460 Not Implemented
UK1314 # 02 Y:2013 02 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,512 $28,560 Implemented
UK1314 # 05 Y:2013 05 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,066 $0 Implemented
UK1314 # 04 Y:2013 04 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,453 $15,000 Implemented
UK1314 # 08 Y:2013 08 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $798 $700 Implemented
UK1314 # 07 Y:2013 07 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $1,662 $650 Implemented
UK1314 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $3,739 $4,500 Implemented
UK1314 # 09 Y:2013 09 2013 USE PHOTOCELL CONTROLS $328 $592 Implemented
UK1314 # 01 Y:2013 01 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $12,434 $44,000 Implemented
UK1314 # 06 Y:2013 06 2013 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,594 $0 Implemented
UK1314 # 10 Y:2013 10 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $690 $690 Implemented
SU0345 # 02 Y:2013 02 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,340 $132 Not Implemented
SU0345 # 03 Y:2013 03 2013 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $335 $738 Not Implemented
SU0345 # 04 Y:2013 04 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $155 $655 Not Implemented
SU0345 # 05 Y:2013 05 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $50 $238 Not Implemented
SU0345 # 01 Y:2013 01 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $97 $0 Not Implemented