IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

104

matching recommendations
Reset
NAICS 333995 Fluid Power Cylinder and Actuator Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0472 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,172 $10,141 Implemented
IA0472 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $421 $1,228 Implemented
OK0794 # 01 Y:2010 01 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,132 $75,405 Implemented
OK0794 # 02 Y:2010 02 2010 INSTALL SET-BACK TIMERS $2,786 $3,239 Not Implemented
OK0794 # 03 Y:2010 03 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $10,317 $159,840 Not Implemented
OK0794 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,034 $12,733 Not Implemented
OK0794 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,300 $68,625 Not Implemented
OK0794 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $853 $4,978 Not Implemented
OK0794 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $653 $3,006 Not Implemented
OK0794 # 08 Y:2010 08 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,400 $841 Implemented
OK0794 # 09 Y:2010 09 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $380 $2,280 Not Implemented
IA0431 # 01 Y:2008 01 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $723 $346 Implemented
IA0431 # 02 Y:2008 02 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $640 $12 Not Implemented
IA0431 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,028 $1,014 Implemented
IA0431 # 04 Y:2008 04 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,300 $1,300 Implemented
IA0431 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,425 $31,431 Implemented
IA0431 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,840 $4,141 Implemented
IA0431 # 07 Y:2008 07 2008 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,067 $1,096 Not Implemented
SD0379 # 01 Y:2006 01 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $212,485 $900,288 Not Implemented
SD0379 # 02 Y:2006 02 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $169,122 $0 Not Implemented
SD0379 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $110,534 $160,385 Not Implemented
SD0379 # 04 Y:2006 04 2006 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $82,170 $150,000 Not Implemented
SD0379 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $23,140 $18,110 Not Implemented
SD0379 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,974 $220 Implemented
UD0716 # 01 Y:2005 01 2005 USE POWER DURING OFF-PEAK PERIODS $72,768 $0 Not Implemented