Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
32
matching recommendationsNAICS | 333996 | Fluid Power Pump and Motor Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1086 # 02 Y:2024 | 02 | 2024 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $573 | $0 | Implemented |
UD1086 # 06 Y:2024 | 06 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $561 | $0 | Implemented |
UD1061 # 02 Y:2023 | 02 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $6,024 | $375 | Implemented |
UD1061 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $496 | $952 | Implemented |
LE0548 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,456 | $100 | Implemented |
LE0548 # 02 Y:2023 | 02 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $5,982 | $1,900 | Implemented |
LE0548 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,252 | $2,480 | Implemented |
LE0548 # 07 Y:2023 | 07 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,121 | $45,050 | Implemented |
TT0275 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,633 | $2,905 | Implemented |
TT0275 # 06 Y:2022 | 06 | 2022 | AIR CONDITION ONLY SPACE NECESSARY | $3,488 | $9,000 | Implemented |
UF0577 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,991 | $304 | Implemented |
UF0577 # 11 Y:2022 | 11 | 2022 | RECOVER AND REUSE WASTE MATERIAL | $28,657 | $31,000 | Implemented |
UF0577 # 03 Y:2022 | 03 | 2022 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $3,363 | $0 | Implemented |
UF0577 # 10 Y:2022 | 10 | 2022 | SCHEDULE DELIVERIES ACCORDING TO DEMAND | $3,120 | $2,528 | Implemented |
UF0577 # 06 Y:2022 | 06 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,972 | $0 | Implemented |
UF0577 # 09 Y:2022 | 09 | 2022 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $1,049 | $200 | Implemented |
UF0577 # 01 Y:2022 | 01 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,354 | $640 | Implemented |
UF0577 # 02 Y:2022 | 02 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,407 | $2,618 | Implemented |
CO0742 # 03 Y:2021 | 03 | 2021 | INSTALL OCCUPANCY SENSORS | $1,478 | $359 | Implemented |
CO0742 # 04 Y:2021 | 04 | 2021 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,318 | $16,143 | Implemented |
CO0742 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,833 | $2,733 | Implemented |
OK0823 # 04 Y:2012 | 04 | 2012 | INSULATE BARE EQUIPMENT | $5,300 | $16,148 | Implemented |
OK0823 # 03 Y:2012 | 03 | 2012 | INSTALL OCCUPANCY SENSORS | $922 | $2,975 | Implemented |
OK0815 # 04 Y:2011 | 04 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $340 | $950 | Implemented |
OK0815 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,341 | $930 | Implemented |