Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
235
matching recommendationsNAICS | 333999 | All Other Miscellaneous General Purpose Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0065 # 05 Y:2011 | 05 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $832 | $1,935 | Not Implemented |
UA0065 # 06 Y:2011 | 06 | 2011 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $510 | $1,533 | Not Implemented |
WV0414 # 01 Y:2010 | 01 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $22,889 | $18,300 | Not Implemented |
WV0414 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,304 | $42,420 | Implemented |
WV0414 # 03 Y:2010 | 03 | 2010 | REDUCE FLUID FLOW RATES | $7,185 | $280 | Implemented |
WV0414 # 04 Y:2010 | 04 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,064 | $15,400 | Not Implemented |
WV0414 # 05 Y:2010 | 05 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,414 | $400 | Not Implemented |
WV0414 # 06 Y:2010 | 06 | 2010 | USE RADIANT HEATER FOR SPOT HEATING | $3,403 | $5,310 | Not Implemented |
WV0414 # 07 Y:2010 | 07 | 2010 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,505 | $14,000 | Not Implemented |
WV0414 # 08 Y:2010 | 08 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,467 | $3,614 | Implemented |
WV0414 # 09 Y:2010 | 09 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,409 | $835 | Not Implemented |
WV0414 # 10 Y:2010 | 10 | 2010 | RECOVER MECHANICAL ENERGY | $1,362 | $1,000 | Implemented |
WV0414 # 11 Y:2010 | 11 | 2010 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,335 | $1,070 | Implemented |
WV0414 # 12 Y:2010 | 12 | 2010 | DEVELOP A REPAIR/REPLACE POLICY | $1,318 | $740 | Implemented |
WV0414 # 13 Y:2010 | 13 | 2010 | IMPROVE LUBRICATION PRACTICES | $413 | $465 | Not Implemented |
WV0414 # 14 Y:2010 | 14 | 2010 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $388 | $1,735 | Implemented |
UD0793 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,450 | $25,000 | Implemented |
UD0793 # 02 Y:2009 | 02 | 2009 | INSULATE BARE EQUIPMENT | $6,677 | $1,000 | Implemented |
UD0793 # 03 Y:2009 | 03 | 2009 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,960 | $500 | Not Implemented |
UD0793 # 04 Y:2009 | 04 | 2009 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $3,855 | $0 | Implemented |
UD0793 # 05 Y:2009 | 05 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,799 | $400 | Not Implemented |
UD0793 # 06 Y:2009 | 06 | 2009 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,114 | $0 | Implemented |
UD0793 # 07 Y:2009 | 07 | 2009 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,970 | $1,000 | Implemented |
UD0793 # 08 Y:2009 | 08 | 2009 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $2,460 | $2,500 | Implemented |
UD0793 # 09 Y:2009 | 09 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,488 | $0 | Implemented |