IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
NAICS 333999 All Other Miscellaneous General Purpose Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0028 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $2,322 $0 Not Implemented
MU0028 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,186 $0 Implemented
MU0028 # 08 Y:2023 08 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $490 $1,162 Not Implemented
MU0028 # 07 Y:2023 07 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $550 $776 Not Implemented
MU0028 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $643 $1,100 Implemented
MU0028 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $863 $112 Implemented
MU0028 # 04 Y:2023 04 2023 USE PHOTOCELL CONTROLS $138 $348 Implemented
MU0028 # 03 Y:2023 03 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,919 $0 Implemented
WV0456 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,518 $95,285 Implemented
WV0456 # 15 Y:2012 15 2012 DEVELOP A REPAIR/REPLACE POLICY $1,089 $981 Implemented
WV0456 # 16 Y:2012 16 2012 USE PHOTOCELL CONTROLS $824 $705 Implemented
WV0456 # 13 Y:2012 13 2012 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $1,180 $1,000 Implemented
WV0456 # 14 Y:2012 14 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,129 $555 Implemented
WV0456 # 11 Y:2012 11 2012 IMPROVE LUBRICATION PRACTICES $1,660 $1,000 Implemented
WV0456 # 12 Y:2012 12 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,637 $2,475 Implemented
WV0456 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,729 $12,395 Implemented
WV0456 # 09 Y:2012 09 2012 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $3,207 $5,050 Not Implemented
WV0456 # 10 Y:2012 10 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,040 $2,069 Implemented
WV0456 # 08 Y:2012 08 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,545 $7,380 Not Implemented
WV0456 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,893 $58,995 Implemented
WV0456 # 05 Y:2012 05 2012 IMPROVE COMBUSTION CONTROL CAPABILITY $11,368 $38,096 Not Implemented
WV0456 # 06 Y:2012 06 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $23,618 $33,940 Not Implemented
WV0456 # 03 Y:2012 03 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $14,765 $41,700 Not Implemented
WV0456 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,458 $2,000 Not Implemented
UD0793 # 02 Y:2009 02 2009 INSULATE BARE EQUIPMENT $6,677 $1,000 Implemented