IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,278

matching recommendations
Reset
NAICS 334 Computer and Electronic Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0057 # 18 Y:2010 18 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,000 $0 Implemented
MZ0057 # 19 Y:2010 19 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $19,660 $18,000 Implemented
MZ0057 # 21 Y:2010 21 2010 INSULATE BARE EQUIPMENT $248 $300 Implemented
CO0643 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,130 $340 Implemented
CO0643 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,370 $33,822 Implemented
IA0454 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,680 $5,214 Implemented
IA0454 # 02 Y:2010 02 2010 INSTALL OCCUPANCY SENSORS $1,365 $1,560 Implemented
IA0454 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,229 $300 Implemented
IA0454 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $980 $400 Implemented
IA0454 # 07 Y:2010 07 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,152 $300 Implemented
IA0454 # 08 Y:2010 08 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $201 $150 Implemented
WV0410 # 01 Y:2010 01 2010 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $92,924 $0 Implemented
WV0410 # 03 Y:2010 03 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,551 $2,200 Implemented
WV0410 # 04 Y:2010 04 2010 IMPROVE LUBRICATION PRACTICES $1,907 $618 Implemented
WV0410 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $1,273 $210 Implemented
WV0410 # 08 Y:2010 08 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,020 $67 Implemented
WV0410 # 10 Y:2010 10 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $200 $20 Implemented
MA0666 # 03 Y:2010 03 2010 ADD AREA LIGHTING SWITCHES $1,900 $500 Implemented
SU0296 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $81,934 $0 Implemented
SU0296 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $758 $447 Implemented
SU0296 # 06 Y:2010 06 2010 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $79,942 $129,646 Implemented
LL0326 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $44,220 $15,480 Implemented
LL0326 # 02 Y:2010 02 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $31,166 $6,970 Implemented
LL0326 # 03 Y:2010 03 2010 INSULATE BARE EQUIPMENT $13,685 $3,250 Implemented
UF0428 # 01 Y:2009 01 2009 MINIMIZE USE OF RAGS THROUGH WORKER TRAINING $1,734 $0 Implemented