IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

122

matching recommendations
Reset
NAICS 334 Computer and Electronic Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0492 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,158 $34,531 Implemented
SD0492 # 03 Y:2014 03 2014 INSULATE BARE EQUIPMENT $3,880 $1,527 Implemented
SD0492 # 04 Y:2014 04 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,731 $4,350 Implemented
SD0492 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $881 $1,791 Implemented
SD0492 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $531 $400 Implemented
SF0441 # 01 Y:2013 01 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $27,444 $0 Implemented
SF0441 # 02 Y:2013 02 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $651 $420 Implemented
SD0438 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,004 $300 Implemented
SD0438 # 05 Y:2011 05 2011 OPTIMIZE PLANT POWER FACTOR $12,712 $37,600 Implemented
SF0397 # 01 Y:2011 01 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,161 $0 Implemented
SF0397 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,394 $0 Implemented
SF0397 # 05 Y:2011 05 2011 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,066 $2,420 Implemented
SF0397 # 07 Y:2011 07 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,428 $6,271 Implemented
SF0397 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $3,294 $7,163 Implemented
SF0397 # 09 Y:2011 09 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $19,656 $79,881 Implemented
SD0407 # 01 Y:2008 01 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,517 $5,878 Implemented
SD0407 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,196 $13,699 Implemented
SD0407 # 04 Y:2008 04 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,008 $7,140 Implemented
SD0407 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,341 $1,374 Implemented
LM0122 # 04 Y:2007 04 2007 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $19,128 $5,500 Implemented
LM0122 # 05 Y:2007 05 2007 MODIFY WORKLOAD $9,311 $4,850 Implemented
LM0119 # 06 Y:2006 06 2006 CONDENSE OPERATION INTO ONE BUILDING $3,375,000 $500,000 Implemented
LM0096 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,099 $1,300 Implemented
LM0096 # 02 Y:2005 02 2005 UPGRADE CONTROLS ON COMPRESSORS $5,434 $350 Implemented
LM0096 # 04 Y:2005 04 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $364 $400 Implemented