IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

171

matching recommendations
Reset
NAICS 334 Computer and Electronic Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0513 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $90,618 $28,940 Not Implemented
AS0513 # 06 Y:2022 06 2022 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $6,454 $122 Not Implemented
AS0513 # 07 Y:2022 07 2022 INSTALL OCCUPANCY SENSORS $1,979 $1,772 Not Implemented
AS0513 # 08 Y:2022 08 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,143 $411 Not Implemented
AS0477 # 05 Y:2019 05 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,125 $1,213 Implemented
AS0477 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,264 $3,590 Implemented
AS0477 # 03 Y:2019 03 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $17,100 $7,907 Implemented
AS0477 # 02 Y:2019 02 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $64,747 $120,000 Implemented
AS0477 # 01 Y:2019 01 2019 ADOPT IN-HOUSE MATERIAL GENERATION $718,945 $688,982 Not Implemented
AS0465 # 06 Y:2019 06 2019 RECOVER MECHANICAL ENERGY $4,582 $20,880 Not Implemented
AS0465 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,608 $3,900 Not Implemented
AS0465 # 04 Y:2019 04 2019 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $10,850 $17,634 Implemented
AS0465 # 03 Y:2019 03 2019 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $41,936 $1,100 Not Implemented
AS0465 # 02 Y:2019 02 2019 UPGRADE CONTROLS ON COMPRESSORS $56,756 $18,258 Not Implemented
AS0465 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $66,350 $43,576 Not Implemented
AS0453 # 05 Y:2018 05 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,699 $685 Not Implemented
AS0453 # 07 Y:2018 07 2018 INSULATE BARE EQUIPMENT $374 $55 Not Implemented
AS0453 # 06 Y:2018 06 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $433 $240 Not Implemented
AS0453 # 01 Y:2018 01 2018 INSTALL SET-BACK TIMERS $7,726 $83 Not Implemented
AS0453 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $2,232 $1,350 Not Implemented
AS0453 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,598 $5,816 Not Implemented
AS0453 # 03 Y:2018 03 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,076 $18,560 Not Implemented
AS0434 # 06 Y:2017 06 2017 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $461 $450 Not Implemented
AS0434 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,564 $60 Not Implemented
AS0434 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,250 $2,513 Not Implemented