IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
NAICS 334111 Electronic Computer Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0104 # 09 Y:2013 09 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $30,500 $700 Not Implemented
DL0104 # 11 Y:2013 11 2013 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $48,100 $50,000 Not Implemented
DL0104 # 12 Y:2013 12 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $15,500 $31,050 Not Implemented
DL0104 # 13 Y:2013 13 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $10,200 $3,800 Not Implemented
DL0104 # 14 Y:2013 14 2013 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $29,700 $1,320 Not Implemented
DL0104 # 15 Y:2013 15 2013 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $18,800 $45,000 Not Implemented
DL0104 # 16 Y:2013 16 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $22,505 $10,700 Not Implemented
DL0104 # 17 Y:2013 17 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,800 $37,400 Not Implemented
MZ0023 # 02 Y:2008 02 2008 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,828 $2,077 Not Implemented
MZ0023 # 04 Y:2008 04 2008 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,210 $1,941 Not Implemented
MZ0023 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,564 $27,000 Implemented
MZ0023 # 01 Y:2008 01 2008 INSULATE BARE EQUIPMENT $183 $80 Implemented
MZ0023 # 05 Y:2008 05 2008 REPAIR OR REPLACE STEAM TRAPS $47,858 $40,000 Implemented
LM0122 # 01 Y:2007 01 2007 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $42,830 $89,250 Not Implemented
LM0122 # 02 Y:2007 02 2007 ISOLATE HOT OR COLD EQUIPMENT $814 $2,000 Not Implemented
LM0122 # 03 Y:2007 03 2007 INSTALL OCCUPANCY SENSORS $1,465 $3,975 Not Implemented
LM0122 # 04 Y:2007 04 2007 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $19,128 $5,500 Implemented
LM0122 # 05 Y:2007 05 2007 MODIFY WORKLOAD $9,311 $4,850 Implemented
UF0376 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,968 $27,399 Not Implemented
UF0376 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,222 $2,053 Not Implemented
UF0376 # 03 Y:2006 03 2006 ADD AREA LIGHTING SWITCHES $878 $2,646 Not Implemented
UF0376 # 04 Y:2006 04 2006 INSTALL BACK-UP EQUIPMENT $1,632,456 $5,315 Not Implemented
UF0376 # 05 Y:2006 05 2006 AIR CONDITION ONLY SPACE NECESSARY $1,014 $3,200 Not Implemented
UF0376 # 06 Y:2006 06 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $150 $1,480 Not Implemented
UF0376 # 07 Y:2006 07 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $369 $0 Not Implemented