IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

148

matching recommendations
Reset
NAICS 33422 Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1409 # 02 Y:2014 02 2014 OPTIMIZE PLANT POWER FACTOR $13,858 $7,731 Not Implemented
UK1409 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,135 $456 Not Implemented
UK1409 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,815 $2,358 Not Implemented
UK1409 # 05 Y:2014 05 2014 COMBINE UTILITY METERS $2,250 $831 Not Implemented
UK1409 # 06 Y:2014 06 2014 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,197 $0 Not Implemented
UK1409 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,648 $16,700 Not Implemented
UK1409 # 08 Y:2014 08 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $33,225 $3,000 Not Implemented
UK1409 # 09 Y:2014 09 2014 INSULATE BARE EQUIPMENT $10,898 $18,400 Not Implemented
UK1409 # 10 Y:2014 10 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,187 $2,400 Not Implemented
UK1409 # 11 Y:2014 11 2014 ELIMINATE/REDUCE AN OPERATION $27,643 $9,000 Not Implemented
CO0693 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,130 $570 Implemented
CO0693 # 02 Y:2014 02 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,940 $6,400 Not Implemented
CO0693 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,450 $50,000 Implemented
CO0693 # 04 Y:2014 04 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,260 $1,250 Implemented
UD0864 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,307 $2,925 Implemented
UD0864 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,307 $2,925 Implemented
UD0864 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,365 $2,650 Implemented
UD0864 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,365 $2,650 Implemented
UD0864 # 05 Y:2012 05 2012 UPGRADE CONTROLS ON COMPRESSORS $5,184 $0 Not Implemented
UD0864 # 06 Y:2012 06 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $888 $1,300 Implemented
UD0864 # 07 Y:2012 07 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $1,934 $0 Implemented
UD0864 # 08 Y:2012 08 2012 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $191,536 $383,074 Not Implemented
UD0864 # 09 Y:2012 09 2012 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $27,112 $122,500 Not Implemented
SU0323 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $387 $0 Not Implemented
SU0323 # 02 Y:2012 02 2012 PAY BILLS ON TIME TO AVOID LATE FEES $131 $0 Implemented