Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,581
matching recommendationsNAICS | 3344 | Semiconductor and Other Electronic Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0294 # 03 Y:2016 | 03 | 2016 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $8,706 | $5,161 | Not Implemented |
MI0294 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,388 | $1,660 | Implemented |
MI0294 # 05 Y:2016 | 05 | 2016 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $5,921 | $1,441 | Implemented |
MI0294 # 06 Y:2016 | 06 | 2016 | CONDENSE OPERATION INTO ONE BUILDING | $5,648 | $1,360 | Not Implemented |
MI0294 # 07 Y:2016 | 07 | 2016 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $4,081 | $4,200 | Implemented |
MZ0204 # 01 Y:2016 | 01 | 2016 | INSTALL OCCUPANCY SENSORS | $3,536 | $1,500 | Implemented |
MZ0204 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,259 | $37,722 | Implemented |
MZ0204 # 03 Y:2016 | 03 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,678 | $1,200 | Implemented |
MZ0204 # 04 Y:2016 | 04 | 2016 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $266 | $0 | Not Implemented |
MZ0204 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,246 | $1,212 | Implemented |
TT0165 # 01 Y:2016 | 01 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $33,510 | $75,000 | Not Implemented |
TT0165 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,405 | $88,306 | Implemented |
TT0165 # 03 Y:2016 | 03 | 2016 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $4,033 | $3,600 | Implemented |
TT0165 # 04 Y:2016 | 04 | 2016 | OPERATE BOILERS ON HIGH FIRE SETTING | $4,000 | $12,000 | Implemented |
TT0165 # 05 Y:2016 | 05 | 2016 | INSULATE BARE EQUIPMENT | $2,310 | $1,919 | Implemented |
TT0165 # 06 Y:2016 | 06 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $883 | $1,500 | Implemented |
TT0165 # 07 Y:2016 | 07 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $310 | $200 | Implemented |
MZ0197 # 01 Y:2015 | 01 | 2015 | INSTALL OCCUPANCY SENSORS | $5,337 | $1,752 | Implemented |
MZ0197 # 02 Y:2015 | 02 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,900 | $960 | Implemented |
MZ0197 # 03 Y:2015 | 03 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $11,344 | $3,200 | Implemented |
MZ0197 # 04 Y:2015 | 04 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,362 | $1,160 | Implemented |
MZ0197 # 05 Y:2015 | 05 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,151 | $0 | Not Implemented |
DL0149 # 01 Y:2015 | 01 | 2015 | INSULATE BARE EQUIPMENT | $15,210 | $630 | Not Implemented |
DL0149 # 02 Y:2015 | 02 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,780 | $0 | Implemented |
DL0149 # 03 Y:2015 | 03 | 2015 | INSTALL TIMERS AND/OR THERMOSTATS | $6,060 | $35 | Implemented |