IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,581

matching recommendations
Reset
NAICS 3344 Semiconductor and Other Electronic Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0568 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $660 $2,400 Implemented
CO0568 # 08 Y:2005 08 2005 RECOVER WASTE HEAT FROM EQUIPMENT $400 $1,750 Not Implemented
CO0568 # 09 Y:2005 09 2005 USE SOLAR HEAT TO HEAT WATER $360 $1,510 Not Implemented
SU0212 # 01 Y:2005 01 2005 PAY BILLS ON TIME TO AVOID LATE FEES $395 $0 Implemented
SU0212 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,679 $0 Implemented
SU0212 # 03 Y:2005 03 2005 USE SYNTHETIC LUBRICANT $375 $0 Implemented
SU0212 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $670 $0 Not Implemented
SU0212 # 05 Y:2005 05 2005 INSTALL TURBULATORS $985 $571 Not Implemented
SU0212 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,637 $1,889 Implemented
SU0212 # 07 Y:2005 07 2005 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $12,179 $10,575 Not Implemented
SU0212 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $1,966 $2,792 Implemented
SU0212 # 09 Y:2005 09 2005 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $230 $383 Not Implemented
SU0212 # 10 Y:2005 10 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $148 $527 Implemented
SU0212 # 11 Y:2005 11 2005 REDUCE VENTILATION AIR $3,820 $13,919 Not Implemented
SU0212 # 12 Y:2005 12 2005 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $97,661 $114,600 Not Implemented
SU0212 # 13 Y:2005 13 2005 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $21,189 $111,859 Not Implemented
UF0361 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,815 $9 Implemented
UF0361 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,264 $1 Implemented
UF0361 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,324 $2 Implemented
UF0361 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,002 $2 Implemented
UF0361 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $1,934 $0 Implemented
UF0361 # 06 Y:2005 06 2005 RECYCLE FLUORESCENT LAMPS $574 $3 Not Implemented
LM0096 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,099 $1,300 Implemented
LM0096 # 02 Y:2005 02 2005 UPGRADE CONTROLS ON COMPRESSORS $5,434 $350 Implemented
LM0096 # 03 Y:2005 03 2005 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $91,510 $125,000 Not Implemented