IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
NAICS 3344 Semiconductor and Other Electronic Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0599 # 06 Y:2017 06 2017 DEVELOP A REPAIR/REPLACE POLICY $4,037 $13,627 Implemented
NC0599 # 05 Y:2017 05 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,472 $2,940 Not Implemented
NC0599 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,240 $200 Implemented
NC0599 # 03 Y:2017 03 2017 RECOVER WASTE HEAT FROM EQUIPMENT $1,262 $500 Not Implemented
NC0599 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $300 $1,500 Implemented
NC0599 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,256 $36,992 Implemented
NC0504 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $333 $50 Implemented
NC0504 # 07 Y:2013 07 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,341 $21,429 Implemented
NC0504 # 06 Y:2013 06 2013 INSTALL OCCUPANCY SENSORS $1,428 $2,892 Implemented
NC0504 # 05 Y:2013 05 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $618 $300 Implemented
NC0504 # 04 Y:2013 04 2013 RECOVER WASTE HEAT FROM EQUIPMENT $363 $850 Not Implemented
NC0504 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $103 $100 Implemented
NC0504 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $686 $25 Not Implemented
NC0323 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $2,020 $3,726 Not Implemented
NC0323 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,893 $50 Not Implemented
NC0323 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $87,704 $291,200 Implemented
NC0323 # 04 Y:2005 04 2005 AIR CONDITION ONLY SPACE NECESSARY $8,095 $0 Not Implemented
NC0323 # 05 Y:2005 05 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $30,533 $0 Not Implemented
NC0323 # 06 Y:2005 06 2005 INSTALL TIMERS AND/OR THERMOSTATS $16,545 $10,648 Implemented
NC0323 # 07 Y:2005 07 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,783 $150 Implemented