IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
NAICS 3344 Semiconductor and Other Electronic Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0211 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $110 $0 n/a
WM0211 # 05 Y:2024 05 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $216 $345 n/a
WM0211 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,148 $150 n/a
WM0211 # 03 Y:2024 03 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,617 $9,500 n/a
WM0211 # 02 Y:2024 02 2024 USE RADIANT HEATER FOR SPOT HEATING $5,517 $16,193 n/a
WM0211 # 01 Y:2024 01 2024 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $7,114 $700 n/a
WM0199 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,125 $1,662 Not Implemented
WM0199 # 04 Y:2023 04 2023 USE COMPRESSOR AIR FILTERS $1,447 $2,189 Implemented
WM0199 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,795 $44,389 Implemented
WM0199 # 03 Y:2023 03 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,889 $2,175 Not Implemented
WM0199 # 02 Y:2023 02 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,348 $0 Not Implemented
WM0136 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $549 $0 Not Implemented
WM0136 # 05 Y:2019 05 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $692 $0 Not Implemented
WM0136 # 03 Y:2019 03 2019 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $1,529 $1,319 Not Implemented
WM0136 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,803 $4,811 Not Implemented
WM0136 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $854 $1,600 Not Implemented
WM0136 # 01 Y:2019 01 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $23,987 $106,000 Not Implemented
WM0016 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,622 $488 Not Implemented
WM0016 # 03 Y:2012 03 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,517 $0 Implemented
WM0016 # 05 Y:2012 05 2012 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,769 $13,000 Not Implemented
WM0016 # 07 Y:2012 07 2012 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $962 $5,000 Not Implemented
WM0016 # 02 Y:2012 02 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $652 $850 Not Implemented
WM0016 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $957 $270 Not Implemented
WM0016 # 06 Y:2012 06 2012 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $2,004 $0 Implemented
WM0012 # 04 Y:2012 04 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,999 $5,230 Implemented