Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,679
matching recommendationsNAICS | 33441 | Semiconductor and Other Electronic Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NT0048 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,298 | $0 | n/a |
NT0048 # 04 Y:2025 | 04 | 2025 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $13,913 | $73,500 | n/a |
NT0048 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $20,312 | $55,710 | n/a |
NT0048 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,633 | $5,609 | n/a |
NT0048 # 06 Y:2025 | 06 | 2025 | OPTIMIZE PLANT POWER FACTOR | $7,122 | $25,622 | n/a |
NT0048 # 07 Y:2025 | 07 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $321,458 | $5,000 | n/a |
NT0048 # 03 Y:2025 | 03 | 2025 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $998 | $1,346 | n/a |
WV0686 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,920 | $1,550 | n/a |
WV0686 # 04 Y:2025 | 04 | 2025 | INSTALL SET-BACK TIMERS | $1,875 | $1,135 | n/a |
WV0686 # 07 Y:2025 | 07 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $247 | $108 | n/a |
WV0686 # 03 Y:2025 | 03 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,393 | $9,261 | n/a |
WV0686 # 02 Y:2025 | 02 | 2025 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $2,427 | $11,850 | n/a |
WV0686 # 06 Y:2025 | 06 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $814 | $894 | n/a |
WV0686 # 05 Y:2025 | 05 | 2025 | INSULATE BARE EQUIPMENT | $964 | $412 | n/a |
MZ0376 # 02 Y:2025 | 02 | 2025 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $916 | $365 | n/a |
MZ0376 # 06 Y:2025 | 06 | 2025 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $4,289 | $14,380 | n/a |
MZ0376 # 07 Y:2025 | 07 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $86,491 | $702,000 | n/a |
MZ0376 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,296 | $7,200 | n/a |
MZ0376 # 01 Y:2025 | 01 | 2025 | INSTALL OCCUPANCY SENSORS | $4,145 | $1,560 | n/a |
MZ0376 # 03 Y:2025 | 03 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,548 | $54,000 | n/a |
MZ0376 # 08 Y:2025 | 08 | 2025 | REDUCE VENTILATION AIR | $3,456 | $6,974 | n/a |
MZ0376 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $2,889 | $18,327 | n/a |
NT0044 # 03 Y:2025 | 03 | 2025 | INSTALL EQUIPMENT TO MOVE PRODUCT | $150,000 | $182,000 | n/a |
NT0044 # 05 Y:2025 | 05 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $31,678 | $5,000 | n/a |
NT0044 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $3,340 | $18,058 | n/a |