Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,688
matching recommendationsNAICS | 33441 | Semiconductor and Other Electronic Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2509 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,936 | $100 | n/a |
UC2509 # 09 Y:2024 | 09 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $13,478 | $50 | n/a |
UC2509 # 08 Y:2024 | 08 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $29,692 | $9,100 | n/a |
UC2509 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $19,546 | $32,370 | n/a |
UC2509 # 01 Y:2024 | 01 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $28,237 | $0 | n/a |
UC2509 # 05 Y:2024 | 05 | 2024 | REPLACE BOILER | $42,258 | $132,297 | n/a |
UC2509 # 07 Y:2024 | 07 | 2024 | INSULATE BARE EQUIPMENT | $8,347 | $2,798 | n/a |
UC2509 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,269 | $1,190 | n/a |
UC2509 # 02 Y:2024 | 02 | 2024 | PAY UTILITY BILLS ON TIME | $114 | $0 | n/a |
NT0048 # 03 Y:2025 | 03 | 2025 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $998 | $1,346 | n/a |
NT0048 # 07 Y:2025 | 07 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $321,458 | $5,000 | n/a |
NT0048 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $20,312 | $55,710 | n/a |
NT0048 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,633 | $5,609 | n/a |
NT0048 # 04 Y:2025 | 04 | 2025 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $13,913 | $73,500 | n/a |
NT0048 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,298 | $0 | n/a |
NT0048 # 06 Y:2025 | 06 | 2025 | OPTIMIZE PLANT POWER FACTOR | $7,122 | $25,622 | n/a |
WV0686 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,920 | $1,550 | n/a |
WV0686 # 04 Y:2025 | 04 | 2025 | INSTALL SET-BACK TIMERS | $1,875 | $1,135 | n/a |
WV0686 # 03 Y:2025 | 03 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,393 | $9,261 | n/a |
WV0686 # 05 Y:2025 | 05 | 2025 | INSULATE BARE EQUIPMENT | $964 | $412 | n/a |
WV0686 # 02 Y:2025 | 02 | 2025 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $2,427 | $11,850 | n/a |
WV0686 # 06 Y:2025 | 06 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $814 | $894 | n/a |
WV0686 # 07 Y:2025 | 07 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $247 | $108 | n/a |
MZ0376 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $2,889 | $18,327 | n/a |
MZ0376 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,296 | $7,200 | n/a |