Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,581
matching recommendationsNAICS | 33441 | Semiconductor and Other Electronic Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0453 # 07 Y:2018 | 07 | 2018 | INSULATE BARE EQUIPMENT | $374 | $55 | Not Implemented |
MI0321 # 01 Y:2017 | 01 | 2017 | USE OPTIMUM THICKNESS INSULATION | $17,954 | $21,920 | Implemented |
MI0321 # 02 Y:2017 | 02 | 2017 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $10,816 | $7,589 | Implemented |
MI0321 # 03 Y:2017 | 03 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,233 | $3,600 | Implemented |
MI0321 # 04 Y:2017 | 04 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,777 | $5,492 | Not Implemented |
MI0321 # 05 Y:2017 | 05 | 2017 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $5,988 | $6,400 | Not Implemented |
MI0321 # 06 Y:2017 | 06 | 2017 | OPTIMIZE PLANT POWER FACTOR | $3,370 | $10,745 | Not Implemented |
MI0321 # 07 Y:2017 | 07 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,256 | $1,660 | Implemented |
MI0321 # 08 Y:2017 | 08 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,121 | $1,508 | Not Implemented |
MI0321 # 09 Y:2017 | 09 | 2017 | INSULATE BARE EQUIPMENT | $1,612 | $1,914 | Implemented |
MI0321 # 10 Y:2017 | 10 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $766 | $400 | Implemented |
NC0599 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,256 | $36,992 | Implemented |
NC0599 # 02 Y:2017 | 02 | 2017 | INSTALL OCCUPANCY SENSORS | $300 | $1,500 | Implemented |
NC0599 # 03 Y:2017 | 03 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,262 | $500 | Not Implemented |
NC0599 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,240 | $200 | Implemented |
NC0599 # 05 Y:2017 | 05 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,472 | $2,940 | Not Implemented |
NC0599 # 06 Y:2017 | 06 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $4,037 | $13,627 | Implemented |
AS0434 # 01 Y:2017 | 01 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $68,034 | $6,582 | Not Implemented |
AS0434 # 02 Y:2017 | 02 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $43,502 | $4,394 | Not Implemented |
AS0434 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,405 | $1,200 | Not Implemented |
AS0434 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,250 | $2,513 | Not Implemented |
AS0434 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,564 | $60 | Not Implemented |
AS0434 # 06 Y:2017 | 06 | 2017 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $461 | $450 | Not Implemented |
AS0434 # 07 Y:2017 | 07 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $307 | $60 | Implemented |
UF0510 # 01 Y:2017 | 01 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $1,528 | $419 | Implemented |