IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,581

matching recommendations
Reset
NAICS 33441 Semiconductor and Other Electronic Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0168 # 06 Y:2008 06 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,677 $3,475 Not Implemented
MI0168 # 07 Y:2008 07 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $33,795 $22,516 Implemented
MI0168 # 08 Y:2008 08 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $22,202 $3,320 Implemented
MA0640 # 01 Y:2008 01 2008 REDUCE VENTILATION AIR $36,692 $39,000 Implemented
MA0640 # 02 Y:2008 02 2008 OPTIMIZE PLANT POWER FACTOR $11,811 $11,850 Implemented
MA0640 # 03 Y:2008 03 2008 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $11,640 $43,000 Not Implemented
MA0640 # 04 Y:2008 04 2008 MINIMIZE WATER USAGE $4,210 $18,000 Not Implemented
MA0640 # 05 Y:2008 05 2008 INSTALL TIMERS AND/OR THERMOSTATS $1,895 $3,000 Implemented
MA0640 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $977 $0 Implemented
MA0640 # 07 Y:2008 07 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $644 $689 Implemented
OK0765 # 01 Y:2008 01 2008 INSTALL OCCUPANCY SENSORS $1,794 $2,151 Not Implemented
OK0765 # 02 Y:2008 02 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $340 $0 Implemented
OK0765 # 03 Y:2008 03 2008 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,600 $0 Not Implemented
OK0765 # 04 Y:2008 04 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,176 $4,690 Not Implemented
OK0765 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,974 $18,623 Implemented
OK0765 # 06 Y:2008 06 2008 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $42,105 $161,000 Implemented
MI0166 # 01 Y:2008 01 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $360,093 $695,000 Not Implemented
MI0166 # 02 Y:2008 02 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $70,996 $1,200 Implemented
MI0166 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,899 $41,800 Implemented
MI0166 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,060 $1,210 Implemented
MI0166 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,713 $40 Implemented
MI0166 # 06 Y:2008 06 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,677 $3,475 Not Implemented
WV0376 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,171 $21,771 Implemented
WV0376 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,887 $23,022 Implemented
WV0376 # 03 Y:2008 03 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $7,524 $5,130 Implemented