IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
NAICS 33441 Semiconductor and Other Electronic Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CM1013 # 02 Y:2022 02 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,342 $3,480 n/a
CM1013 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,819 $3,590 n/a
CM1013 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $465 $260 n/a
CM1013 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $10,211 $116,226 n/a
CO0597 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,620 $6,660 Not Implemented
CO0597 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,860 $10,220 Not Implemented
CO0597 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,820 $140 Implemented
CO0597 # 01 Y:2007 01 2007 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,720 $19,200 Not Implemented
CO0597 # 05 Y:2007 05 2007 USE SOLAR HEAT TO MAKE ELECTRICTY $1,360 $11,000 Not Implemented
CO0597 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $630 $850 Implemented
CO0597 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $90 $390 Not Implemented
CO0570 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,270 $210 Implemented
CO0570 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $280 $420 Implemented
CO0570 # 03 Y:2005 03 2005 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,090 $1,990 Not Implemented
CO0570 # 04 Y:2005 04 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $850 $1,310 Not Implemented
CO0570 # 05 Y:2005 05 2005 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $680 $340 Implemented
CO0570 # 06 Y:2005 06 2005 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $7,880 $8,110 Not Implemented
CO0570 # 07 Y:2005 07 2005 INSTALL SKYLIGHTS $3,180 $19,200 Not Implemented
CO0570 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,070 $5,110 Implemented
CO0570 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $610 $1,210 Implemented
CO0568 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,510 $330 Implemented
CO0568 # 02 Y:2005 02 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $540 $0 Not Implemented
CO0568 # 04 Y:2005 04 2005 COMBINE UTILITY METERS $10,660 $43,050 Not Implemented
CO0568 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,100 $6,680 Implemented
CO0568 # 08 Y:2005 08 2005 RECOVER WASTE HEAT FROM EQUIPMENT $400 $1,750 Not Implemented