IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
NAICS 33441 Semiconductor and Other Electronic Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0225 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,037 $53,169 Not Implemented
TT0225 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,576 $3,500 Not Implemented
TT0225 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,140 $3,390 Not Implemented
TT0225 # 05 Y:2019 05 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,118 $1,900 Not Implemented
TT0225 # 01 Y:2019 01 2019 APPLY FOR INVESTMENT INCENTIVES $61,196 $11,500 Implemented
TT0165 # 07 Y:2016 07 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $310 $200 Implemented
TT0165 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $883 $1,500 Implemented
TT0165 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $2,310 $1,919 Implemented
TT0165 # 04 Y:2016 04 2016 OPERATE BOILERS ON HIGH FIRE SETTING $4,000 $12,000 Implemented
TT0165 # 03 Y:2016 03 2016 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $4,033 $3,600 Implemented
TT0165 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,405 $88,306 Implemented
TT0165 # 01 Y:2016 01 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $33,510 $75,000 Not Implemented
MS0269 # 08 Y:2005 08 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $495 $180 Not Implemented
MS0269 # 07 Y:2005 07 2005 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $8,354 $0 Implemented
MS0269 # 06 Y:2005 06 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $11,055 $0 Implemented
MS0269 # 05 Y:2005 05 2005 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $24,256 $50 Implemented
MS0269 # 04 Y:2005 04 2005 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $38,704 $8,800 Implemented
MS0269 # 03 Y:2005 03 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $61,542 $1,920 Implemented
MS0269 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $61,735 $79,029 Implemented
MS0269 # 01 Y:2005 01 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $126,283 $13,608 Implemented