Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsNAICS | 33441 | Semiconductor and Other Electronic Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0574 # 05 Y:2021 | 05 | 2021 | REDUCE DELIVERY SCHEDULES | $19,915 | $56,589 | Implemented |
SF0574 # 02 Y:2021 | 02 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,180 | $4,064 | Not Implemented |
SF0574 # 03 Y:2021 | 03 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,332 | $38,413 | Implemented |
SF0574 # 01 Y:2021 | 01 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $6,067 | $5,306 | Implemented |
SF0574 # 04 Y:2021 | 04 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $96,904 | $419,477 | Implemented |
NL0059 # 06 Y:2021 | 06 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $139 | $220 | Not Implemented |
NL0059 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,547 | $51,468 | Implemented |
NL0059 # 02 Y:2021 | 02 | 2021 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $8,198 | $50,347 | Not Implemented |
NL0059 # 03 Y:2021 | 03 | 2021 | INSTALL OCCUPANCY SENSORS | $702 | $4,153 | Not Implemented |
NL0059 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $479 | $500 | Implemented |
NL0059 # 05 Y:2021 | 05 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $318 | $1,350 | Not Implemented |
OR0741 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,176 | $40,448 | Not Implemented |
OR0741 # 02 Y:2021 | 02 | 2021 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $56,371 | $0 | Not Implemented |
OR0741 # 03 Y:2021 | 03 | 2021 | USE HEAT PUMP FOR SPACE CONDITIONING | $25,522 | $19,860 | Not Implemented |
AM0824 # 02 Y:2021 | 02 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,400 | $1,855 | Not Implemented |
AM0824 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,660 | $4,400 | Implemented |
AM0824 # 03 Y:2021 | 03 | 2021 | INSTALL OCCUPANCY SENSORS | $700 | $360 | Implemented |
MA0826 # 02 Y:2021 | 02 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,639 | $14,650 | Not Implemented |
MA0826 # 07 Y:2021 | 07 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $323 | $625 | Not Implemented |
MA0826 # 06 Y:2021 | 06 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $551 | $1,450 | Implemented |
MA0826 # 05 Y:2021 | 05 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $552 | $250 | Not Implemented |
MA0826 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $979 | $1,631 | Implemented |
MA0826 # 03 Y:2021 | 03 | 2021 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,447 | $10,800 | Not Implemented |
MA0826 # 01 Y:2021 | 01 | 2021 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $27,883 | $250,000 | Not Implemented |
LE0507 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $746 | $40 | Not Implemented |