Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsNAICS | 334412 | Bare Printed Circuit Board Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0426 # 09 Y:2006 | 09 | 2006 | USE SOLAR HEAT TO HEAT WATER | $3,172 | $14,400 | Not Implemented |
AS0426 # 08 Y:2006 | 08 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,590 | $20,832 | Not Implemented |
AS0426 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,539 | $15,085 | Implemented |
AS0426 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,221 | $1,000 | Implemented |
AS0426 # 05 Y:2006 | 05 | 2006 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $6,172 | $2,000 | Not Implemented |
AS0426 # 04 Y:2006 | 04 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $7,727 | $5,500 | Not Implemented |
AS0426 # 03 Y:2006 | 03 | 2006 | INSULATE BARE EQUIPMENT | $8,267 | $2,077 | Implemented |
AS0426 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,823 | $500 | Implemented |
AS0426 # 01 Y:2006 | 01 | 2006 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $10,102 | $17,458 | Not Implemented |
AS0371 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,176 | $60 | Not Implemented |
AS0371 # 08 Y:2004 | 08 | 2004 | INSTALL OCCUPANCY SENSORS | $2,853 | $4,125 | Not Implemented |
AS0371 # 07 Y:2004 | 07 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,938 | $144 | Not Implemented |
AS0371 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,040 | $45,048 | Not Implemented |
AS0371 # 04 Y:2004 | 04 | 2004 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $12,453 | $7,000 | Not Implemented |
AS0371 # 03 Y:2004 | 03 | 2004 | SUBSTITUTE AIR FOR STEAM TO ATOMIZE OIL | $17,943 | $12,000 | Not Implemented |
AS0371 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $62,038 | $22,800 | Not Implemented |
AS0371 # 01 Y:2004 | 01 | 2004 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $87,632 | $105,000 | Not Implemented |
AS0370 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,289 | $150 | Not Implemented |
AS0370 # 06 Y:2004 | 06 | 2004 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,372 | $5,500 | Not Implemented |
AS0370 # 05 Y:2004 | 05 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,794 | $1,844 | Not Implemented |
AS0370 # 04 Y:2004 | 04 | 2004 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $10,545 | $16,000 | Not Implemented |
AS0370 # 03 Y:2004 | 03 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,336 | $12,650 | Not Implemented |
AS0370 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,258 | $39,378 | Not Implemented |