Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsNAICS | 334412 | Bare Printed Circuit Board Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0733 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $442 | $1,360 | Implemented |
OK0733 # 06 Y:2006 | 06 | 2006 | INSTALL OCCUPANCY SENSORS | $1,460 | $3,919 | Implemented |
OK0733 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,077 | $9,738 | Implemented |
OK0733 # 04 Y:2006 | 04 | 2006 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $3,500 | $0 | Not Implemented |
OK0733 # 03 Y:2006 | 03 | 2006 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,003 | $980 | Implemented |
OK0733 # 02 Y:2006 | 02 | 2006 | INSTALL OCCUPANCY SENSORS | $6,122 | $13,600 | Implemented |
OK0733 # 01 Y:2006 | 01 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,333 | $5,000 | Not Implemented |
AS0426 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,823 | $500 | Implemented |
AS0426 # 08 Y:2006 | 08 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,590 | $20,832 | Not Implemented |
AS0426 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,539 | $15,085 | Implemented |
AS0426 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,221 | $1,000 | Implemented |
AS0426 # 05 Y:2006 | 05 | 2006 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $6,172 | $2,000 | Not Implemented |
AS0426 # 04 Y:2006 | 04 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $7,727 | $5,500 | Not Implemented |
AS0426 # 03 Y:2006 | 03 | 2006 | INSULATE BARE EQUIPMENT | $8,267 | $2,077 | Implemented |
AS0426 # 01 Y:2006 | 01 | 2006 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $10,102 | $17,458 | Not Implemented |
AS0426 # 09 Y:2006 | 09 | 2006 | USE SOLAR HEAT TO HEAT WATER | $3,172 | $14,400 | Not Implemented |
WI0514 # 10 Y:2006 | 10 | 2006 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,084 | $0 | Not Implemented |
WI0514 # 09 Y:2006 | 09 | 2006 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $1,616 | $0 | Not Implemented |
WI0514 # 08 Y:2006 | 08 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,289 | $640 | Not Implemented |
WI0514 # 07 Y:2006 | 07 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,678 | $0 | Implemented |
WI0514 # 06 Y:2006 | 06 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,412 | $0 | Not Implemented |
WI0514 # 05 Y:2006 | 05 | 2006 | COVER OPEN TANKS | $2,414 | $0 | Not Implemented |
WI0514 # 04 Y:2006 | 04 | 2006 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $665 | $0 | Not Implemented |
WI0514 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,466 | $6,300 | Implemented |
WI0514 # 02 Y:2006 | 02 | 2006 | IMPROVE SPACE COMFORT CONDITIONING | $9,074 | $900 | Implemented |