Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 2006 |
Principal Product | Assembley and Testing of PCB |
NAICS | 334412 - Bare Printed Circuit Board Manufacturing |
SIC | 3679 - Electronic Components, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 140 |
Plant Area (Sq.Ft.) | 60,000 |
Annual Production | 3,600,000 Units |
Production Hrs. Annual | 4,250 |
Location (State) | WI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $95,506 | 2,862,000 | kWh | $0.03 |
Electricity Demand | $65,825 | 6,174 | kW-months/year | $10.66 |
Natural Gas | $23,367 | 2,502 | MMBtu | $9.34 |
TOTAL ENERGY COSTS | $184,698 | |||
RECOMMENDED SAVINGS* | $179,338 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $13,218 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.424 IMPROVE SPACE COMFORT CONDITIONING |
Savings: $156,640 Cost: $48,500 |
- | - | - | - | - | - | $156,640 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$156,640 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.424 IMPROVE SPACE COMFORT CONDITIONING |
Savings: $9,074 Cost: $900 |
- | - | - | - | - | - | $9,074 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$9,074 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,466 Cost: $6,300 |
$1,313 | 37,515 | $1,153 | 103 | - | - | - | - |
$1,313 37,515 kWh |
$1,153 103 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $665 Cost: - |
$352 | 10,063 | $313 | 28 | - | - | - | - |
$352 10,063 kWh |
$313 28 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2514 COVER OPEN TANKS |
Savings: $2,414 Cost: - |
$2,414 | 68,969 | - | - | - | - | - | - |
$2,414 68,969 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,412 Cost: - |
- | - | - | - | $2,412 | 258 | - | - |
- - kWh |
- - kW-months/year |
$2,412 258 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,678 Cost: - |
$571 | 16,318 | $1,107 | 99 | - | - | - | - |
$571 16,318 kWh |
$1,107 99 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,289 Cost: $640 |
$573 | 16,362 | $716 | 64 | - | - | - | - |
$573 16,362 kWh |
$716 64 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION |
Savings: $1,616 Cost: - |
- | - | $1,616 | 144 | - | - | - | - |
- - kWh |
$1,616 144 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE |
Savings: $1,084 Cost: - |
- | - | - | - | $1,084 | 93 | - | - |
- - kWh |
- - kW-months/year |
$1,084 93 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $179,338 Cost: $56,340 |
$5,223 | 149,227 | $4,905 | 438 | $3,496 | 351 | $165,714 | - | $5,223 149,227 kWh |
$4,905 438 kW-months/year |
$3,496 351 MMBtu |
$165,714 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $13,218 Cost: $7,200 |
$1,884 | 53,833 | $2,260 | 202 | - | - | $9,074 | - | $1,884 53,833 kWh |
$2,260 202 kW-months/year |
- - MMBtu |
$9,074 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |