IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

266

matching recommendations
Reset
NAICS 334413 Semiconductor and Related Device Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0190 # 05 Y:2021 05 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $361 $1,200 Not Implemented
DL0190 # 04 Y:2021 04 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,650 $0 Implemented
DL0190 # 03 Y:2021 03 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $324 $50 Implemented
DL0190 # 02 Y:2021 02 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,910 $0 Implemented
DL0190 # 01 Y:2021 01 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $180 $0 Implemented
SF0560 # 05 Y:2020 05 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $15,645 $78,611 Implemented
SF0560 # 04 Y:2020 04 2020 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $13,118 $45,851 Implemented
SF0560 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $4,726 $14,983 Implemented
SF0560 # 02 Y:2020 02 2020 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $16,680 $26,850 Not Implemented
SF0560 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,246 $70 Not Implemented
OK0991 # 06 Y:2018 06 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $724 $0 Implemented
OK0991 # 05 Y:2018 05 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,710 $536 Implemented
OK0991 # 04 Y:2018 04 2018 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $5,577 $1,015 Implemented
OK0991 # 03 Y:2018 03 2018 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,813 $0 Not Implemented
OK0991 # 02 Y:2018 02 2018 OPTIMIZE PLANT POWER FACTOR $7,248 $14,404 Not Implemented
OK0991 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,462 $17,053 Implemented
SF0528 # 03 Y:2018 03 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,178 $27,403 Not Implemented
SF0528 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,330 $22,874 Implemented
SF0528 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,402 $11,547 Not Implemented
DL0173 # 07 Y:2017 07 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,800 $3,940 Not Implemented
DL0173 # 06 Y:2017 06 2017 UPGRADE OBSOLETE EQUIPMENT $17,600 $5,950 Implemented
DL0173 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $2,364 $654 Not Implemented
DL0173 # 04 Y:2017 04 2017 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,676 $1,375 Implemented
DL0173 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,100 $9,375 Not Implemented
DL0173 # 01 Y:2017 01 2017 UPGRADE CONTROLS ON COMPRESSORS $20,880 $0 Implemented