Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
279
matching recommendationsNAICS | 334413 | Semiconductor and Related Device Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0254 # 04 Y:2007 | 04 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,686 | $20,000 | Implemented |
LE0254 # 05 Y:2007 | 05 | 2007 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $7,471 | $800 | Not Implemented |
LE0254 # 06 Y:2007 | 06 | 2007 | OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE | $5,988 | $3,000 | Implemented |
LE0254 # 07 Y:2007 | 07 | 2007 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $3,029 | $800 | Not Implemented |
MA0612 # 01 Y:2007 | 01 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $96,635 | $175,500 | Not Implemented |
MA0612 # 02 Y:2007 | 02 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $57,921 | $108,000 | Not Implemented |
MA0612 # 03 Y:2007 | 03 | 2007 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $23,433 | $12,750 | Not Implemented |
MA0612 # 04 Y:2007 | 04 | 2007 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $21,000 | $73,760 | Not Implemented |
MA0612 # 05 Y:2007 | 05 | 2007 | REDUCE VENTILATION AIR | $17,480 | $8,040 | Not Implemented |
MA0612 # 06 Y:2007 | 06 | 2007 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $16,924 | $3,200 | Not Implemented |
MA0612 # 07 Y:2007 | 07 | 2007 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $14,963 | $26,370 | Not Implemented |
MA0612 # 08 Y:2007 | 08 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,240 | $11,700 | Not Implemented |
MA0612 # 09 Y:2007 | 09 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,610 | $18,700 | Not Implemented |
MA0612 # 10 Y:2007 | 10 | 2007 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,532 | $8,000 | Not Implemented |
MA0612 # 11 Y:2007 | 11 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,799 | $1,800 | Not Implemented |
AS0433 # 01 Y:2006 | 01 | 2006 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $34,471 | $30,000 | n/a |
AS0433 # 02 Y:2006 | 02 | 2006 | USE SOLAR HEAT TO HEAT WATER | $13,683 | $78,400 | n/a |
AS0433 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,142 | $7,500 | n/a |
AS0433 # 04 Y:2006 | 04 | 2006 | INSTALL EFFICIENT RECTIFIERS | $540 | $15,000 | n/a |
AS0432 # 01 Y:2006 | 01 | 2006 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $17,236 | $15,000 | n/a |
AS0432 # 02 Y:2006 | 02 | 2006 | USE SOLAR HEAT TO HEAT WATER | $13,683 | $78,400 | n/a |
AS0432 # 03 Y:2006 | 03 | 2006 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $9,888 | $3,000 | n/a |
AS0432 # 04 Y:2006 | 04 | 2006 | INSTALL EFFICIENT RECTIFIERS | $540 | $15,000 | n/a |
LE0240 # 01 Y:2006 | 01 | 2006 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $265,405 | $500,000 | Implemented |
LE0240 # 02 Y:2006 | 02 | 2006 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $74,790 | $800 | Not Implemented |