IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
NAICS 334413 Semiconductor and Related Device Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0640 # 07 Y:2008 07 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $644 $689 Implemented
MA0640 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $977 $0 Implemented
MA0640 # 05 Y:2008 05 2008 INSTALL TIMERS AND/OR THERMOSTATS $1,895 $3,000 Implemented
MA0640 # 04 Y:2008 04 2008 MINIMIZE WATER USAGE $4,210 $18,000 Not Implemented
MA0640 # 03 Y:2008 03 2008 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $11,640 $43,000 Not Implemented
MA0640 # 02 Y:2008 02 2008 OPTIMIZE PLANT POWER FACTOR $11,811 $11,850 Implemented
MA0640 # 01 Y:2008 01 2008 REDUCE VENTILATION AIR $36,692 $39,000 Implemented
MA0612 # 10 Y:2007 10 2007 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,532 $8,000 Not Implemented
MA0612 # 11 Y:2007 11 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,799 $1,800 Not Implemented
MA0612 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $96,635 $175,500 Not Implemented
MA0612 # 09 Y:2007 09 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,610 $18,700 Not Implemented
MA0612 # 08 Y:2007 08 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,240 $11,700 Not Implemented
MA0612 # 07 Y:2007 07 2007 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $14,963 $26,370 Not Implemented
MA0612 # 06 Y:2007 06 2007 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $16,924 $3,200 Not Implemented
MA0612 # 05 Y:2007 05 2007 REDUCE VENTILATION AIR $17,480 $8,040 Not Implemented
MA0612 # 04 Y:2007 04 2007 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $21,000 $73,760 Not Implemented
MA0612 # 03 Y:2007 03 2007 MODERATE COOLING TOWER OUTLET TEMPERATURE $23,433 $12,750 Not Implemented
MA0612 # 02 Y:2007 02 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $57,921 $108,000 Not Implemented