IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
Reset
NAICS 334413 Semiconductor and Related Device Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0907 # 03 Y:2024 03 2024 OPTIMIZE PLANT POWER FACTOR $1,950 $5,135 n/a
AM0907 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,512 $8,350 n/a
AM0907 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $49,120 $358,027 n/a
AM0907 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $625 $240 n/a
AM0907 # 01 Y:2024 01 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $39,560 $5,000 n/a
AM0715 # 02 Y:2016 02 2016 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $53,960 $0 Not Implemented
AM0715 # 03 Y:2016 03 2016 USE SOLAR HEAT FOR HEAT $31,594 $151,288 Implemented
AM0715 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,750 $50 Implemented
AM0715 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $305 $0 Implemented
AM0715 # 06 Y:2016 06 2016 USE OPTIMUM TEMPERATURE $8,060 $9,230 Not Implemented
AM0715 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,530 $50,830 Implemented
AM0715 # 01 Y:2016 01 2016 LOWER CEILING TO REDUCE CONDITIONED SPACE $566,490 $1,145,213 Not Implemented
AM0715 # 07 Y:2016 07 2016 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $4,830 $4,560 Implemented
OK0942 # 01 Y:2016 01 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,767 $3,112 Implemented
OK0942 # 04 Y:2016 04 2016 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $73,902 $31,000 Not Implemented
OK0942 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $972 $4,623 Implemented
OK0942 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,283 $8,000 Not Implemented
OK0942 # 06 Y:2016 06 2016 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $469,328 $2,302,430 Not Implemented
OK0942 # 05 Y:2016 05 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $600 $3,450 Implemented
AM0623 # 09 Y:2012 09 2012 USE SYNTHETIC LUBRICANT $1,010 $0 Not Implemented
AM0623 # 01 Y:2012 01 2012 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $75,600 $270,000 Not Implemented
AM0623 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,800 $13,240 Not Implemented
AM0623 # 03 Y:2012 03 2012 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $36,640 $10,000 Not Implemented
AM0623 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,838 $500 Not Implemented
AM0623 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,538 $1,045 Not Implemented