IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

261

matching recommendations
Reset
NAICS 334416 Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SJ0029 # 04 Y:2025 04 2025 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,874 $6,782 n/a
SJ0029 # 03 Y:2025 03 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $78 $0 n/a
SJ0029 # 06 Y:2025 06 2025 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,952 $0 n/a
SJ0029 # 05 Y:2025 05 2025 INSULATE BARE EQUIPMENT $378 $574 n/a
SJ0029 # 01 Y:2025 01 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $137,645 $376,457 n/a
SJ0029 # 02 Y:2025 02 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,400 $1,940 n/a
OR0790 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $12,196 $107,553 n/a
OR0790 # 01 Y:2024 01 2024 CONTRACT A WOOD PALLET RECYCLING COMPANY $19,663 $0 n/a
OR0790 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $120 $116 n/a
NL0067 # 01 Y:2022 01 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $31,946 $130,000 Not Implemented
NL0067 # 06 Y:2022 06 2022 INSTALL TIMERS AND/OR THERMOSTATS $6,637 $204 Not Implemented
NL0067 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,938 $2,000 Not Implemented
NL0067 # 04 Y:2022 04 2022 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $15,500 $25,400 Not Implemented
NL0067 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,057 $45,606 Not Implemented
NL0067 # 02 Y:2022 02 2022 UPGRADE CONTROLS ON COMPRESSORS $25,304 $17,000 Not Implemented
NL0059 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $702 $4,153 Not Implemented
NL0059 # 05 Y:2021 05 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $318 $1,350 Not Implemented
NL0059 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $479 $500 Implemented
NL0059 # 02 Y:2021 02 2021 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $8,198 $50,347 Not Implemented
NL0059 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,547 $51,468 Implemented
NL0059 # 06 Y:2021 06 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $139 $220 Not Implemented
GT0939 # 03 Y:2020 03 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $165,933 $33,069 Not Implemented
GT0939 # 05 Y:2020 05 2020 INSTALL TIMERS AND/OR THERMOSTATS $652 $563 Implemented
GT0939 # 02 Y:2020 02 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $17,391 $2,000 Implemented
GT0939 # 01 Y:2020 01 2020 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $10,466 $500 Not Implemented