IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

135

matching recommendations
Reset
NAICS 334416 Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0059 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $479 $500 Implemented
NL0059 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,547 $51,468 Implemented
GT0939 # 05 Y:2020 05 2020 INSTALL TIMERS AND/OR THERMOSTATS $652 $563 Implemented
GT0939 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,758 $8,593 Implemented
GT0939 # 02 Y:2020 02 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $17,391 $2,000 Implemented
SU0480 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,439 $20,587 Implemented
SU0480 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $922 $899 Implemented
SU0480 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $1,917 $2,919 Implemented
LE0464 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $114 $40 Implemented
LE0464 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $214 $40 Implemented
LE0464 # 03 Y:2018 03 2018 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $10,836 $28,000 Implemented
LE0464 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,809 $23,000 Implemented
LE0464 # 05 Y:2018 05 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,187 $12,000 Implemented
MI0321 # 09 Y:2017 09 2017 INSULATE BARE EQUIPMENT $1,612 $1,914 Implemented
MI0321 # 02 Y:2017 02 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $10,816 $7,589 Implemented
MI0321 # 01 Y:2017 01 2017 USE OPTIMUM THICKNESS INSULATION $17,954 $21,920 Implemented
MI0321 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $7,233 $3,600 Implemented
MI0321 # 10 Y:2017 10 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $766 $400 Implemented
MI0321 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,256 $1,660 Implemented
SD0544 # 08 Y:2017 08 2017 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $2,798 $7,832 Implemented
SD0544 # 04 Y:2017 04 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,488 $8,800 Implemented
SD0544 # 07 Y:2017 07 2017 USE PHOTOCELL CONTROLS $3,481 $10,611 Implemented
SD0544 # 06 Y:2017 06 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,765 $3,500 Implemented
SD0544 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,529 $41,589 Implemented
SD0544 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,835 $26,705 Implemented